Home › ENGINE · 5L-E › STARTING › STARTING SYSTEM (for 2.7kW Type)

STARTING SYSTEM (for 2.7kW Type) > INSPECTION

for Preparation Click here



1. INSPECT STARTER ASSEMBLY

NOTICE:
The following tests must be done within 3 to 5 seconds to avoid burning out the coil.



    A116239E01
  1. Perform pull-in test.

    1. Disconnect the field coil lead wire from terminal C.

    2. Connect the battery to the magnetic switch. Check that the clutch pinion gear moves outward.



    A112466E01
  1. Perform holding test.

    1. When the battery is connected as above with the clutch pinion gear out, disconnect the negative (-) lead from terminal C. Check that the pinion gear remains out.



    A112467E01
  1. Inspect clutch pinion gear return.

    1. Disconnect the negative (-) lead from the switch body. Check that the clutch pinion gear returns inward.



    A112468E01
  1. Perform the operation test without load.

    1. Connect the field coil lead wire to terminal C.

      Torque:
      24 N*m{ 245 kgf*cm , 18 in.*lbf }

    2. Grip the starter with a vise.

    3. Connect the battery and ammeter to the starter as shown.

    4. Check that the ammeter reads the specified current.

      Specified current:
      180 A or less at 11.5 V



2. INSPECT STARTER RELAY ASSEMBLY


    E033820E02
  1. Continuity inspection.

    1. Using an ohmmeter, measure the resistance between each terminal.

      Specified condition:
      Between terminals
      Specified condition
      1-2
      Below 1 Ω
      3-5
      10 kΩ or higher

    2. Using an ohmmeter, measure the resistance between terminals 3 and 5 when the battery voltage is applied across terminals 1 and 2.

      Specified condition:
      Below 1 Ω