2014-2019 Hiace · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built Jan 2015 – Mar 2016

Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017


1. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

  1. C102619
    Pass the control cable assembly through the floor hole.

  1. Install the transmission control cable assembly with the 2 bolts.

    Torque:
    5.5 N*m{ 56 kgf*cm , 49 in.*lbf }

  1. C112966
    Wide body LHD steering position type:

    1. Install the control cable bracket No.3 to the transmission control cable assembly.

    2. Install the control cable bracket No.3 with the 2 nuts.

      Torque:
      5.5 N*m{ 56 kgf*cm , 49 in.*lbf }

  1. C102618
    Install the front floor footrest with the 2 nuts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. C114293E01
    Install the transmission control cable assembly to the shift lever.

    NOTICE:
    Install the transmission control cable assembly so that the end section of the select cable indicated by the arrow, as shown in the side view, (A in the illustration) faces upward.

  1. C116457E01
    Turn the control cable assembly adjust nut clockwise 180°. While holding the adjust nut, push in the locks.

  1. Install the control cable assembly to the shift lever.

    HINT:
    When the cable is installed to the shift lever, the locks are released and the adjust nut rotates 180°. Then, the locks are engaged again.

    NOTICE:
    Make sure that the control cable assembly is firmly installed to the shift lever.


2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

  1. C102620
    Install the control cable bracket No.2 to the transmission control cable assembly.

  1. Install the control cable bracket No.2 with the 2 nuts.

    Torque:
    5.5 N*m{ 56 kgf*cm , 49 in.*lbf }

  1. C102621
    Install the clamp with the bolt.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. C102625
    Install the control cable support to the control cable assembly.

  1. Install the control cable support with the bolt.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. C102659E01
    Install new 2 clips to the control cable bracket No.1.

  1. Install the transmission control cable assembly to the control cable bracket No.1.

    NOTICE:
    1. Be sure that A claws of the clips are firmly engaged into the bracket grooves.
    2. Be sure the cable is set in the clip with both B claws erected to prevent slippage of the cable in the opposite direction.

  1. C102206E01
    Align the matchmarks on the control cable assembly and the outer lever.

  1. Install the transmission control cable assembly to the outer lever with the 2 nuts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }


3. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER CENTER
  1. Attach the 8 claws to install the instrument panel finish panel lower center.


4. INSTALL SHIFTING HOLE COVER ASSEMBLY
  1. for Manual Transmission:
    Attach the 6 claws to install the shifting hole cover assembly.

  1. for Automatic Transmission:
    Attach the 8 claws to install the shifting hole cover assembly.


5. INSTALL SHIFT LEVER KNOB

  1. B365549E01
    Turn the shift lever knob in the direction indicated by the arrow and install it.
    Text in Illustration 
    *A
    for Manual Transmission
    *B
    for Automatic Transmission


6. INSTALL PARKING BRAKE HOLE COVER
  1. Attach the 6 claws to install the parking brake hole cover.


7. INSTALL INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY NO.1
  1. Attach the 3 claws to instrument panel under cover sub-assembly No. 1.

  1. Install the the 2 clips.


8. INSTALL INSTRUMENT PANEL FINISH PANEL LOWER
  1. Connect the fuel lid lock control cable and bonnet (hood) control cable assembly to the instrument panel finish lower.

  1. Attach the 4 clips to install the instrument panel finish panel lower.

  1. Install the 2 clips.


9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

10. PERFORM INITIALIZATION
Some systems need initialization after reconnecting the cable to the negative battery terminal (Click here).
← INSTALLATION (Oct 2014 – Dec 2014)INSTALLATION (Apr 2016 – Dec 2016) →