2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Oct 2014


1. INSTALL TIMING GEAR CASE ASSEMBLY

  1. A102777E02
    Install 2 new O-rings to the cylinder block grooves.

  1. A052300
    Install the stud bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Remove any old packing (FIPG) material.

  1. Install the oil pump rotor to the timing gear case.

  1. A100876E01
    Install a new gasket to the groove of the timing gear case.

  1. A100875E01
    Apply seal packing to the timing gear case as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal width:
    4 mm (0.16 in.)

    NOTICE:
    After applying FIPG, install the timing gear case assembly within 3 minutes and then tighten its bolts within 15 minutes.

  1. A100878E01
    Install the timing gear case with the union bolt and 8 bolts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Remove the screw plug.

  1. A102910
    Pour approximately 50 cc (1.7 fl.oz) of engine oil into the oil pump.

  1. Reinstall a new gasket and the screw plug.

    Torque:
    42 N*m{ 423 kgf*cm , 31 ft.*lbf }


2. INSTALL OIL STRAINER SUB-ASSEMBLY

  1. A102736
    Install a new gasket and the oil strainer with the 2 bolts and 2 nuts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


3. INSTALL OIL PAN SUB-ASSEMBLY
  1. Remove any old packing (FIPG) material.

  1. A100880E03
    Apply seal packing to the oil pan as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal width:
    4.0 mm (0.16 in.)

    NOTICE:
    Install the oil pan assembly within 3 minutes and tighten its bolts within 15 minutes after applying FIPG is competed.

  1. A074128E01
    Install the oil pan with the 22 bolts and 2 nuts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

  1. Install a new gasket and the drain plug.

    Torque:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }


4. INSTALL SUPPLY PUMP GEAR

  1. A077139
    Install the supply pump with the 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. A069844
    Temporarily install the O-ring and supply pump gear with the nut.

    HINT:
    Fit the key (protrusion) of the supply pump to the key slot of the supply pump gear.

  1. A100864E01
    Using SST, tighten the nut.
    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }


5. INSTALL CRANKSHAFT TIMING GEAR

  1. A100881E01
    Face the crankshaft timing gear with timing mark 1 facing forward.

  1. Align the set key on the crankshaft with the key groove of the crankshaft timing gear.

  1. Using SST and a hammer, tap in the timing gear.

    SST
    09223-00010  


6. INSTALL IDLE GEAR SHAFT NO.1

  1. A069846
    Coat the idle gear shaft No.1 with engine oil as shown in the illustration.

  1. A100885E01
    Install the gear shaft.


7. INSTALL IDLE GEAR NO.1

  1. A100886E01
    Align the "5" timing marks of the idle gear and crankshaft timing gear.

  1. Using SST, turn the supply pump gear, and align the "4" timing marks of the idle gear and supply pump gear, and mesh the gears.

    SST
    09960-10010   (09962-01000, 09963-00600)


8. INSTALL CRANKSHAFT POSITION SENSOR PLATE NO.1

  1. A100888E01
    Align the set key with the key groove of the sensor plate.

  1. Install the sensor plate with the cup side facing outward.


9. INSTALL IDLE GEAR THRUST PLATE

  1. A069855
    Face the thrust plate with the protrusion facing outward.

  1. A100887E01
    Align the bolt holes, and install the thrust plate with the 2 bolts.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }


10. INSTALL TIMING CHAIN OR BELT COVER OIL SEAL

  1. A102765E01
    Using SST and a hammer, tap in a new oil seal until its surface is flush with the timing gear cover edge.
    SST
    09649-17010  
    09950-70010   (09951-07100)

    Oil seal depth from the flat-end surface:
    0 to -0.5 mm (0 to -0.020 in.)

  1. Apply MP grease to the oil seal lip.

    NOTICE:
    Keep the lip clean. Prevent dirt and dust from adhering to that area.


11. INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL

  1. A102764E01
    Using SST and a hammer, tap in a new oil seal until its surface is flush with the timing gear cover edge.
    SST
    09608-32010  
    09950-70010   (09951-07100)

    Oil seal depth from the flat-end surface:
    0 to -0.5 mm (0 to -0.020 in.)

  1. Apply MP grease to the oil seal lip.

    NOTICE:
    Keep the lip clean. Prevent dirt and dust from adhering to that area.


12. INSTALL TIMING GEAR CASE

  1. A051376
    Remove the service bolt.

  1. A100894E01
    Install a new O-ring to the timing gear case assembly.

  1. A110888E02
    Apply seal packing to the timing gear case as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal width:
    4.0 mm (0.16 in.)

    NOTICE:
    Install the timing gear case within 3 minutes and tighten its bolts within 15 minutes after applying FIPG is competed.

  1. A100853
    Install the timing gear case with the 14 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


13. INSTALL WATER PUMP ASSEMBLY

  1. A100852
    Install a new gasket and the water pump with the 5 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


14. INSTALL TIMING BELT COVER NO.2

  1. A100911E01
    Apply seal packing to the timing gear cover as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    Install the timing belt No. 2 cover within 3 minutes and tighten its bolts and nut within 15 minutes after applying FIPG is competed.

  1. A051300
    Install the timing belt No. 2 cover with the 4 bolts and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


15. INSTALL CAMSHAFT TIMING PULLEY
  1. Install the set key to the key groove of the camshaft.

  1. Align the set key with the key groove of the timing pulley.

  1. A100912
    Hold the hexagon portion of the camshaft, and install the timing pulley with the bolt.

    Torque:
    98 N*m{ 1,000 kgf*cm , 72 ft.*lbf }


16. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

  1. A289512E03
    Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover as shown in the illustration.

    NOTICE:
    1. Do not install the gaskets at an angle.
    2. Keep the lip of the gasket free from foreign materials.

  1. Install a new cylinder head cover gasket to the cylinder head cover.

  1. A100928E01
    Apply seal packing to the cylinder head as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    After applying the seal packing, parts must be assembled within 3 minutes, and then tighten them within 15 minutes.

  1. A051295
    Install the cylinder head cover with 10 bolts and 2 nuts. Uniformly tighten the bolts and nuts in several steps.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


17. INSTALL NOZZLE HOLDER SEAL

  1. A102858E01
    Install 4 new holder seals.


18. INSTALL OIL FILLER CAP SUB-ASSEMBLY

  1. A074130E01
    Install the oil filler cap.


19. INSTALL ENGINE OIL LEVEL SENSOR
  1. Set a new gasket, and then install the engine oil level sensor with the 4 bolts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 52 in.*lbf }


20. INSTALL CRANKSHAFT POSITION SENSOR

  1. A102906
    Apply a light coat of engine oil to the O-ring of the crankshaft position sensor.

  1. A102285
    Install the crankshaft position sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

    NOTICE:
    Be careful that the O-ring is not cracked or jammed when installing the crankshaft position sensor.

  1. Connect the 3 wire harness clamps.

  1. A102284
    Connect the crankshaft position sensor connector to the vacuum pipe No.1.

  1. Connect the crankshaft position sensor connector.


21. INSTALL CAMSHAFT POSITION SENSOR

  1. A102907
    Apply a light coat of engine oil to the O-ring of the camshaft position sensor.

  1. A102283
    Install the camshaft position sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

    NOTICE:
    Be careful that the O-ring is not cracked or jammed when installing the camshaft position sensor.

  1. Connect the camshaft position sensor connector.


22. INSTALL VACUUM PUMP ASSEMBLY
  1. Apply the engine oil to the 2 new O-rings.

  1. Install the 2 O-rings to the vacuum pump assembly.

  1. C102555
    Install the vacuum pump assembly to the engine with the 2 nuts.

    Torque:
    21 N*m{ 210 kgf*cm , 15 ft.*lbf }

    NOTICE:
    1. Do not drop the vacuum pump packing.
    2. Make sure that the vacuum pump assembly is securely installed.

  1. C102554
    Install the vacuum pump union and the 2 new gaskets with the union bolt.

    Torque:
    14 N*m{ 140 kgf*cm , 10 ft.*lbf }

    NOTICE:
    Check that the stopper of the vacuum pump union is securely holding on the vacuum pump assembly.

  1. Connect the 2 hoses with the clip to the vacuum pump.

    NOTICE:
    Set the vacuum hose so the white marking facing upward.


23. INSTALL CRANKSHAFT PULLEY

  1. A072417E01
    Tighten the bolt holding the crankshaft pulley with SST.
    SST
    09213-58013  
    09330-00021  

    Torque:
    365 N*m{ 3,722 kgf*cm , 270 ft.*lbf }


24. INSTALL TIMING BELT IDLER SUB-ASSEMBLY NO.1

  1. A070696
    Using a 10 mm hexagon wrench, install a new washer and the timing belt idler with the bolt.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Do not reuse the washer.


25. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

  1. A101148E01
    Temporarily install the V-ribbed belt tensioner with the 4 bolts.

    HINT:
    Make sure that the V-ribbed belt tensioner is in contact with the engine block at points A shown in the illustration.

  1. Tighten the V-ribbed belt tensioner with the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


26. INSTALL GENERATOR ASSEMBLY

  1. A113682E01
    Install the generator assembly with the bolt.

    Torque:
    62 N*m{ 632 kgf*cm , 46 ft.*lbf }

  1. Install the generator wire to terminal B with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.

  1. Connect the generator connector.


27. INSTALL GENERATOR BRACKET

  1. A102712J01
    Install the generator bracket with the 2 bolts.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }


28. INSTALL IDLE PULLEY ASSEMBLY
  1. Install the idler pulley and washers with the bolt.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


29. INSTALL COMPRESSOR BRACKET

  1. A102453E02
    Temporarily install the compressor bracket with the 4 bolts.

    HINT:
    Make sure that the compressor bracket is in contact with the engine block.

  1. Install the compressor bracket by tightening the 4 bolts as shown in the illustration.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


30. INSTALL PUMP DRIVE SHAFT PULLEY
(Click here)

31. CHECK PUMP DRIVE SHAFT THRUST CLEARANCE

  1. A071144
    Push the pump drive shaft pulley back and forth to check a thrust clearance of the injection pump drive shaft.

    Thrust clearance:
    0.15 to 0.55 mm (0.0059 to 0.0217 in.)

    NOTICE:
    Make sure that the crankshaft pulley's notch is at 30 degree in the counterclockwise direction form the TDC position.

    HINT:
    If there is not thrust clearance, disassemble and reassemble the injection pump and pump drive shaft pulley.


32. INSTALL COMMON RAIL ASSEMBLY

  1. A102476E01
    Install the common rail assembly with the 2 bolts.

    Torque:
    38 N*m{ 387 kgf*cm , 28 ft.*lbf }

  1. Connect the fuel hose to the fuel pressure limiter.

  1. Connect the fuel pressure sensor connector.


33. INSTALL FUEL INLET PIPE SUB-ASSEMBLY

NOTICE:
  1. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket, or timing gear case with a new one, replace the fuel inlet pipe.
  2. Be careful not to adhere dusts, dirt or any other materials onto the joint area of the fuel inlet pipe.

  1. Temporarily install the fuel inlet pipe.

  1. Using SST, tighten the injection pipe on the common rail side.

    SST
    09023-12701  

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with SST

  1. Using SST, tighten the injection pipe on the supply pump side.

    SST
    09023-12701  

    Torque:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf } for use with SST


34. INSTALL INJECTION PIPE
SST
09023-12701  

NOTICE:
  1. When replacing the fuel injector, common rail, or cylinder head with a new one, replace injection pipes No. 1, No. 2, No. 3, and No. 4.
  2. Keep clean the joint of the injection pipe.

  1. Install the injection pipes.

    1. A103532
      Temporarily install the 4 injection pipes.

    2. A103526
      Install the injection pipe clamp No.3 in 2 nuts.

      Torque:
      5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    3. A103532E01
      Fasten the union sequentially, from the injection pipe common rail to the injector, using SST.
      SST
      09023-12701  

      Torque:
      Use union nut wrench and torque wrench:
      32 N*m{ 326 kgf*cm , 24 ft.*lbf }


35. INSTALL OIL LEVEL GAGE GUIDE
  1. Install a new O-ring to the oil level gauge guide.

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the oil level gauge guide with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Install the oil level gauge.


36. INSTALL EGR PIPE SUB-ASSEMBLY NO.1

  1. A106845
    Install 2 new gaskets to the cylinder head and the EGR pipe sub-assembly No.1 as shown in the illustration.

  1. A106844
    Install the EGR pipe with the 2 bolts and the 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. A106043
    Connect the fuel pressure sensor connector.


37. INSTALL FAN PULLEY
  1. Install the fan pulley with the 4 nuts.

    Torque:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }


38. PERFORM PISTON AND VALVE BREAK PREVENT WORK

  1. A070551
    When turning the camshaft with the timing belt removed, turn the crankshaft 90° counterclockwise.

    NOTICE:
    When installing the timing belt, it is necessary to return the camshaft to the timing marks and then turn the crankshaft clockwise so that it aligns with the timing marks as shown in the illustration.


39. INSTALL TIMING BELT

  1. A070691E01
    Check that the timing marks are aligned as shown in the illustration.

  1. Install the timing belt to pump drive shaft pulley, camshaft timing pulley and timing belt idler No.1 in sequence.

  1. A070548
    Set the tensioner to the press upright.

    NOTICE:
    1. Do not allow the rod end to scratch and deform.
    2. Press the tensioner rod in upward.
    3. Protect a tip of the push rod with a rag in order to prevent damage.

  1. Using a press, slowly apply 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force to the push rod.

    NOTICE:
    Do not apply loads 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) or more on the push rod.

  1. Align the holes of push rod and housing, pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.

  1. Temporarily install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.

  1. Tighten the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    NOTICE:
    Uniformly tighten the 2 bolts and install the tensioner

  1. Remove the 1.5 mm hexagon wrench from the tensioner.

  1. A070549E01
    Turn the crankshaft in the clockwise direction twice, check that the timing marks are aligned as shown in the illustration.


40. INSTALL TIMING BELT COVER NO.1

  1. A102815
    Install the timing belt No.1 cover with the 6 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }

  1. Install the wire harness clamp.


41. INSTALL VANE PUMP ASSEMBLY
  1. Install a new vane pump O-ring to the vane pump assembly.

  1. C101372E01
    Install the vane pump assembly with the 2 nuts.

    Torque:
    39 N*m{ 398 kgf*cm , 29 ft.*lbf }

    NOTICE:
    Make sure that the vane pump O-ring is not caught between other parts.


42. INSTALL ENGINE ASSEMBLY
(Click here)
← INSPECTION (from Oct 2014)COMPONENTS (from Oct 2014) →