2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Apr 2016 – Dec 2016

Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017


1. INSTALL STARTER ASSEMBLY

  1. A115883E01
    Install the starter with the bolt and 2 nuts.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }

  1. A115882E01
    Connect the wire harness to terminal 30 and install the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Close the terminal cap.

  1. Connect the terminal 50 connector to the starter assembly.

  1. A113410E01
    for Wide body:
    Install the ground cable with the bolt.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }


2. INSTALL TRANSMISSION CONTROL CABLE BRACKET NO.1 (for Automatic Transmission)

  1. C101783
    Install the transmission control cable bracket No.1 to the automatic transmission assembly with the 2 bolts.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }


3. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY (for Automatic Transmission)

  1. C101771E02
    Fix the transmission control cable assembly to the control cable bracket with a clip.

  1. Install the transmission control cable assembly to the control shaft lever with the nut.

    Torque:
    15 N*m{ 150 kgf*cm , 11 ft.*lbf }


4. INSTALL ENGINE SIDE UNDER COVER LH (w/ Engine Side Under Cover LH)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }


5. INSTALL ENGINE SIDE UNDER COVER RH (w/ Engine Side Under Cover RH)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }


6. INSTALL ENGINE UNDER COVER NO.2 (w/ Engine Under Cover No.2)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }


7. CONNECT NEGATIVE BATTERY CABLE

8. PERFORM INITIALIZATION
  1. Some system need initialization when reconnecting the battery cable. (Click here)

← INSTALLATION (Jan 2015 – Mar 2016)INSTALLATION (from Jan 2017) →