2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Oct 2014


1. INSTALL PCV VALVE SUB-ASSEMBLY

  1. A253711E01
    Apply a light coat of engine oil to the O-ring.
    Text in Illustration 
    *1
    O-Ring

  1. Install the PCV valve sub-assembly.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    HINT:
    When reusing the PCV valve sub-assembly, inspect the O-ring.

    If the O-ring has scratches or cuts, replace the PCV valve sub-assembly.

  1. Connect the PCV hose to the PCV valve sub-assembly, and slide the clamp to secure the hose.


2. INSTALL ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY
  1. Install the engine service hole cover sub-assembly with the 5 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


3. INSTALL FRONT DOOR SCUFF PLATE RH

4. INSTALL FRONT SEAT ASSEMBLY RH
(Click here)
← INSPECTION (from Oct 2014)COMPONENTS (from Oct 2014) →