2014-2019 Hiace · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built from Oct 2014


1. REMOVE FRONT SEAT ASSEMBLY RH
(Click here)

2. REMOVE FRONT DOOR SCUFF PLATE RH

3. REMOVE ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY
  1. Roll up the carpet, and remove the 5 bolts and engine service hole sub cover.


4. REMOVE PCV VALVE SUB-ASSEMBLY

  1. A113530
    Slide the clamp and disconnect the PCV hose from the PCV valve sub-assembly.

  1. Remove the PCV valve sub-assembly.

← COMPONENTS (from Oct 2014)INSPECTION (from Oct 2014) →