INSPECTION
Inspection · Vehicles built from Oct 2014
| INSPECT PURGE VSV |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
1 - 2
20°C (68°F)
23 to 26 Ω
1 - Body ground
Always
10 MΩ or higher
2 - Body ground
- HINT:
- When measuring the coil resistance make sure that the surface temperature of the purge VSV is 20°C (68°F).
Check the operation.
Check that air does not flow from port E to port F.

Text in Illustration *a
Port E
*b
Port F


Air
Apply battery voltage across the terminals.
Check that air flows from port E to port F.

If the result is not as specified, replace the purge VSV.Text in Illustration *a
Port E
*b
Port F


Air
