INSTALLATION
Removal / installation · Vehicles built from Oct 2014
| 1.
INSTALL VANE PUMP ASSEMBLY |
 |
Install a new vane pump O-ring to the vane pump assembly.
- Install the vane pump assembly with the 2 nuts.
-
Torque:
- 39 N*m{
398 kgf*cm
, 29 ft.*lbf
}
- NOTICE:
- Make sure that the vane pump O-ring is not caught between other parts.
| 2.
CONNECT PRESSURE FEED TUBE ASSEMBLY |
 |
Install a new gasket to the pressure feed tube assembly.
- Connect the pressure feed tube assembly to the vane pump assembly with the union bolt.
-
Torque:
- 50 N*m{
510 kgf*cm
, 37 ft.*lbf
}
- HINT:
- Make sure the stopper of the pressure feed tube assembly contacts the vane pump assembly as shown in the illustration.
| 3.
CONNECT OIL RESERVOIR TO PUMP HOSE NO.1 |
 |
- Connect the oil reservoir to pump hose No.1 to the vane pump assembly with the clip.
| 4.
ADD POWER STEERING FLUID |
|
| 5.
BLEED POWER STEERING FLUID |
 |
(Click here)
| 6.
CHECK FOR POWER STEERING FLUID LEAKS |
|
| 7.
INSTALL ENGINE UNDER COVER NO.2 |
|
| 8.
INSTALL ENGINE UNDER COVER NO.1 |
|