ADJUSTMENT
Removal / installation · Vehicles built Oct 2014 – Dec 2014
| 1. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Move the shift lever to N.
Remove the bolt from the park/neutral position switch assembly.

Text in Illustration *a
Neutral Basic Line
*b
Groove
Clean the bolt and the bolt hole.
Align the neutral basic line with the groove of the park/neutral position switch assembly.
Apply adhesive to 2 or 3 threads on the end of the bolt.
- Adhesive:
- Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
Hold the park/neutral position switch assembly in position and tighten the bolt.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
After adjustment, perform the inspection (Click here).
