2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Oct 2014


1. INSTALL DIESEL THROTTLE BODY ASSEMBLY

NOTICE:
After removing and installing, or replacing the throttle body, be sure to perform the operation check.

  1. Install a new gasket to intake air connector.

  1. A102902
    Install the throttle body with the 2 bolts and the 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. A102282
    Connect the 2 throttle body connectors.


2. INSTALL AIR HOSE NO.4

  1. A102281
    Install the air hose No.4 with the 2 clamps.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }


3. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve)

  1. A106845
    Install 2 new gaskets to the cylinder head and the EGR pipe sub-assembly No.1 as shown in the illustration.

  1. A106844
    Install the EGR pipe with the 2 bolts and the 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. A106043
    Connect the fuel pressure sensor connector.


4. CONNECT OIL RETURN HOSE (w/ Intercooler)

  1. A106042
    Connect the oil return hose with the clip.


5. INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY

  1. A102278
    Install the vane pump oil reservoir assembly with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


6. INSTALL ENGINE UNDER COVER NO.1 (w/ Engine Under Cover No.1)

Torque:
13 N*m{ 133 kgf*cm , 10 ft.*lbf }

← INSPECTION (from Oct 2014)COMPONENTS (from Oct 2014) →