INSTALLATION
Removal / installation · Vehicles built from Oct 2014
| 1. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
- NOTICE:
- After removing and installing, or replacing the throttle body, be sure to perform the operation check.
Install a new gasket to intake air connector.
Install the throttle body with the 2 bolts and the 2 nuts.

- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the 2 throttle body connectors.

| 2. INSTALL AIR HOSE NO.4 |
Install the air hose No.4 with the 2 clamps.

- Torque:
- 6.0 N*m{ 61 kgf*cm , 53 in.*lbf }
| 3. INSTALL EGR PIPE SUB-ASSEMBLY NO.1 (w/ EGR Valve) |
Install 2 new gaskets to the cylinder head and the EGR pipe sub-assembly No.1 as shown in the illustration.

Install the EGR pipe with the 2 bolts and the 2 nuts.

- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
Connect the fuel pressure sensor connector.

| 4. CONNECT OIL RETURN HOSE (w/ Intercooler) |
Connect the oil return hose with the clip.

| 5. INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY |
Install the vane pump oil reservoir assembly with the 2 bolts.

- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
| 6. INSTALL ENGINE UNDER COVER NO.1 (w/ Engine Under Cover No.1) |
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
