ON-VEHICLE INSPECTION
Inspection · Vehicles built from Oct 2014
| CHECK FOR FUEL LEAKS |
Check that there are no fuel leaks anywhere on the fuel system after doing maintenance.
- HINT:
- When checking for fuel leaks, make sure that there is pressure in the fuel line.
| CHECK INJECTION OR SUPPLY PUMP ASSEMBLY |
Inspect the engine speed sensor.
Using an ohmmeter, measure the resistance between the terminals.

- Resistance:
- 205 to 255 Ω at 20°C (69°F)
Inspect the spill control valve.
Using an ohmmeter, measure the resistance between the terminals.

- Resistance:
- 1 to 2 Ω at 20°C (69°F)
Inspect the timing control valve.
Using an ohmmeter, measure the resistance between the terminals.

- Resistance:
- 10 to 14 Ω at 20°C (69°F)
Inspect the timing control valve solenoid operation.
Connect the battery positive terminal to the timing control valve terminal +B.
Connect the battery negative terminal to the timing control valve terminal TCV.
Check that the solenoid makes a 'click' sound.
- NOTICE:
- Do not apply voltage for more than 30 seconds to avoid burning out the timing control valve solenoid.
- If repeating this step, wait until the solenoid coils become cool enough that the solenoid can be touched by hand.
- Do not apply voltage for more than 30 seconds to avoid burning out the timing control valve solenoid.
