REMOVAL
Removal / installation · Vehicles built Jan 2015 – Mar 2016
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
| 2. DRAIN ENGINE COOLANT |
- CAUTION:
- Do not remove the radiator reservoir cap sub-assembly while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
- HINT:
- Collect the engine coolant in a container and dispose of it according to the local regulations.
Loosen the radiator drain cock plug and drain the engine coolant.


Text in Illustration *1
Radiator Reservoir Cap Sub-assembly
*2
Radiator Reservoir Assembly
*3
Radiator Drain Cock Plug
*4
Cylinder Block Water Drain Cock Plug
*5
2-Way
-
-
Remove the radiator reservoir cap sub-assembly.
Loosen the cylinder block water drain cock plug and drain the engine coolant from the engine.
| 3. REMOVE FRONT SEAT ASSEMBLY RH |
| 4. REMOVE FRONT DOOR SCUFF PLATE RH |
| 5. REMOVE ENGINE SERVICE HOLE SUB COVER SUB-ASSEMBLY |
Roll up the carpet, and remove the 5 bolts and engine service hole sub cover sub-assembly.
| 6. REMOVE INTAKE AIR CONNECTOR |
Slide the clamp and disconnect the No. 2 PCV hose from the cylinder head cover sub-assembly.

Disconnect the vacuum hose from the intake air connector.
Loosen the 2 hose clamps.
Remove the 2 bolts and intake air connector.
| 7. REMOVE THROTTLE BODY ASSEMBLY |
Disconnect the throttle motor connector.

Slide the clamp and disconnect the water by-pass hose from the throttle body assembly.
Slide the clamp and disconnect the No. 2 water by-pass hose from the throttle body assembly.
Remove the 4 bolts and throttle body assembly.
Remove the gasket from the intake manifold.

