Loosen the bolt, and disconnect the air cleaner hose No.2.
3.
REMOVE INTAKE AIR CONNECTOR SUB-ASSEMBLY
Disconnect the ventilation hose.
Disconnect the turbo pressure sensor connector.
Remove the bolt, 3 nuts, intake air connector and gasket.
4.
REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY
Disconnect the ventilation hose.
Remove the 9 bolts, nut, cylinder head cover and gasket.
5.
REMOVE CAMSHAFT TIMING PULLEY
Set the No.1 cylinder to approx. 90° BTDC/compression.
HINT:
Set the No.1 cylinder to 90° BTDC/compression to avoid interference with the piston top and valve head.
Using the crankshaft pulley bolt, turn the crankshaft 90° counterclockwise, and put the timing mark of the crankshaft timing pulley with the protrusion of the timing gear case.
Using SST, loosen the pulley bolt.
SST
09960-10010
(09962-01000, 09963-01000)
Using SST, separate the timing pulley from the camshaft.