INSTALLATION
Removal / installation · Vehicles built Apr 2016 – Dec 2016
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1. INSTALL INTEGRATION NO.1 RELAY |
Connect the 3 connectors.
Install the integration relay to the engine room No.2 junction block.
Install the engine room junction block cover.
| 2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 3. PERFORM INITIALIZATION |
