INSTALLATION
Removal / installation · Vehicles built Oct 2014 – Dec 2014
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1. INSTALL NO. 1 INTEGRATION RELAY |
Connect the 3 connectors.
Attach the 2 claws to connect the No. 1 integration relay to the No. 1 junction block.
Install the junction block cover.
| 2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
