INSTALLATION
Removal / installation · Vehicles built Jan 2015 – Mar 2016
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1. INSTALL STARTER ASSEMBLY |
Install the starter assembly with the 2 bolts.
- Torque:
- 37 N*m{ 377 kgf*cm , 27 ft.*lbf }
Connect the starter wire harness with the nut.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
Connect the starter connector.
Close the terminal cap.
Connect the ground cable and wiring harness clamp bracket with the 2 bolts.
- Torque:
- 25 N*m{ 251 kgf*cm , 18 ft.*lbf }
| 2. INSTALL ENGINE SIDE UNDER COVER RH (w/ No. 2 Engine Under Cover) |
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
| 3. INSTALL ENGINE SIDE UNDER COVER LH (w/ No. 2 Engine Under Cover) |
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
| 4. INSTALL NO. 2 ENGINE UNDER COVER (w/ No. 2 Engine Under Cover) |
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
| 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
