INSTALLATION
Removal / installation · Vehicles built from Oct 2014
| 1. INSTALL INJECTOR DRIVER |
Install the injector driver with the 2 nuts.

- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Connect the 2 injector driver connectors.
| 2. INSTALL SUB-BATTERY (w/ Sub-battery) |
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 4. INSTALL BATTERY SERVICE HOLE COVER |
| 5. PERFORM INITIALIZATION |
