INSTALLATION
Removal / installation · Vehicles built Apr 2016 – Dec 2016
Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 Apr 2016 – Dec 2016 from Jan 2017
| 1. INSTALL INTEGRATION NO.1 RELAY |
Connect the 3 connectors.
Install the integration relay onto the engine room No. 1 junction block.
Install the engine room junction block cover.
| 2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
| 3. PERFORM INITIALIZATION |
Perform initialization procedures (Click here).
- NOTICE:
- Certain systems need to be initialized after reconnecting the cable to the negative (-) battery terminal.
