ON-VEHICLE INSPECTION
Inspection · Vehicles built from Oct 2014
| INSPECT NO. 2 INTEGRATION RELAY (HD-LP NO. 1) |
Check the HD-LP No. 1 relay.
Remove the H-LP RH-LO fuse.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
d-2 - 12D-3
Battery voltage not applied to terminals d-2 and 12D-4
10 kΩ or higher
Battery voltage applied to terminals d-2 and 12D-4
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *1
H-LP RH-LO Fuse
*a
Component without harness connected
(No. 2 Integration Relay)
Install the H-LP RH-LO fuse.
| INSPECT NO. 2 INTEGRATION RELAY (DIM NO. 1) |
Check the H-LP RH-HI fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
H-LP RH-HI fuse
Always
Below 1 Ω
Check the DIM No. 1 relay.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
12A-1 - 12C-2
Battery voltage not applied to terminals 12C-3 and 12C-1
10 kΩ or higher
Battery voltage applied to terminals 12C-3 and 12C-1
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *a
Component without harness connected
(No. 2 Integration Relay)
| INSPECT NO. 2 INTEGRATION RELAY (HD-LP NO. 2) |
Check the HD-LP No. 2 relay.
Remove the H-LP LH-LO fuse.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
c-2 - 12B-9
Battery voltage not applied to terminals c-2 and 12B-10
10 kΩ or higher
Battery voltage applied to terminals c-2 and 12B-10
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *1
H-LP LH-LO Fuse
*a
Component without harness connected
(No. 2 Integration Relay)
Install the H-LP LH-LO fuse.
| INSPECT NO. 2 INTEGRATION RELAY (DIM NO. 2) |
Check the H-LP LH-HI fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
H-LP LH-HI fuse
Always
Below 1 Ω
Check the DIM No. 2 relay.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
12A-1 - 12B-12
Battery voltage not applied to terminals 12B-8 and 12B-11
10 kΩ or higher
Battery voltage applied to terminals 12B-8 and 12B-11
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *a
Component without harness connected
(No. 2 Integration Relay)
| INSPECT NO. 2 INTEGRATION RELAY (IG2) |
Check the IG2-MAIN fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
IG2-MAIN fuse
Always
Below 1 Ω
Check the IG2 relay.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
12A-1 - 12D-1
Battery voltage not applied to terminals 12D-2 and 12E-4
10 kΩ or higher
Battery voltage applied to terminals 12D-2 and 12E-4
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *a
Component without harness connected
(No. 2 Integration Relay)
| INSPECT NO. 2 INTEGRATION RELAY (DRL) |
Check the DRL fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
DRL fuse
Always
Below 1 Ω
Check the DRL relay.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
12A-1 - 12D-6
Battery voltage not applied to terminals 12E-12 and 12D-7
10 kΩ or higher
Battery voltage applied to terminals 12E-12 and 12D-7
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *a
Component without harness connected
(No. 2 Integration Relay)
| INSPECT NO. 2 INTEGRATION RELAY (ACC) |
Check the ACC relay.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
12E-7 - 12E-9
Battery voltage not applied to terminals 12E-8 and 12E-4
10 kΩ or higher
Battery voltage applied to terminals 12E-8 and 12E-4
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *a
Component without harness connected
(No. 2 Integration Relay)
| INSPECT NO. 2 INTEGRATION RELAY (100V) |
Check the 100V fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
100V fuse
Always
Below 1 Ω
Check the 100V relay.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
12A-1 - 12E-3
Battery voltage not applied to terminals 12E-1 and 12E-4
10 kΩ or higher
Battery voltage applied to terminals 12E-1 and 12E-4
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *a
Component without harness connected
(No. 2 Integration Relay)
| INSPECT NO. 2 INTEGRATION RELAY (FR FOG) |
Check the FR FOG relay.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
12B-3 - 12B-1
Battery voltage not applied to terminals 12B-6 and 12C-4
10 kΩ or higher
Battery voltage applied to terminals 12B-6 and 12C-4
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *a
Component without harness connected
(No. 2 Integration Relay)
| INSPECT NO. 2 INTEGRATION RELAY (DOME CUT) |
Check the DOME CUT relay.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
12C-7 - 12C-6
Battery voltage not applied to terminals 12C-8 and 12C-5
10 kΩ or higher
Battery voltage applied to terminals 12C-8 and 12C-5
Below 1 Ω
If the result is not as specified, replace the No. 2 integration relay.Text in Illustration *a
Component without harness connected
(No. 2 Integration Relay)
