ON-VEHICLE INSPECTION
Inspection · Vehicles built from Jan 2015
Versions by build date: Oct 2014 – Dec 2014 from Jan 2015
| INSPECT NO. 2 INTEGRATION RELAY (HD-LP NO. 1) |
 |
Check the HD-LP No. 1 relay.
Remove the H-LP RH-LO fuse.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
d-2 - 12D-3
|
Battery voltage not applied to terminals d-2 and 12D-4
|
10 kΩ or higher
|
Battery voltage applied to terminals d-2 and 12D-4
|
Below 1 Ω
|
Text in Illustration
*1
|
H-LP RH-LO Fuse
|
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
Install the H-LP RH-LO fuse.
| INSPECT NO. 2 INTEGRATION RELAY (DIM NO. 1) |
 |
Check the H-LP RH-HI fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
H-LP RH-HI fuse
|
Always
|
Below 1 Ω
|
If the result is not as specified, replace the H-LP RH-HI fuse.
Check the DIM No. 1 relay.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
12A-1 - 12C-2
|
Battery voltage not applied to terminals 12C-3 and 12C-1
|
10 kΩ or higher
|
Battery voltage applied to terminals 12C-3 and 12C-1
|
Below 1 Ω
|
Text in Illustration
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
| INSPECT NO. 2 INTEGRATION RELAY (HD-LP NO. 2) |
 |
Check the HD-LP No. 2 relay.
Remove the H-LP LH-LO fuse.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
c-2 - 12B-9
|
Battery voltage not applied to terminals c-2 and 12B-10
|
10 kΩ or higher
|
Battery voltage applied to terminals c-2 and 12B-10
|
Below 1 Ω
|
Text in Illustration
*1
|
H-LP LH-LO Fuse
|
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
Install the H-LP LH-LO fuse.
| INSPECT NO. 2 INTEGRATION RELAY (DIM NO. 2) |
 |
Check the H-LP LH-HI fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
H-LP LH-HI fuse
|
Always
|
Below 1 Ω
|
If the result is not as specified, replace the H-LP LH-HI fuse.
Check the DIM No. 2 relay.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
12A-1 - 12B-12
|
Battery voltage not applied to terminals 12B-8 and 12B-11
|
10 kΩ or higher
|
Battery voltage applied to terminals 12B-8 and 12B-11
|
Below 1 Ω
|
Text in Illustration
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
| INSPECT NO. 2 INTEGRATION RELAY (IG2) |
 |
Check the IG2-MAIN fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
IG2-MAIN fuse
|
Always
|
Below 1 Ω
|
If the result is not as specified, replace the IG2-MAIN fuse.
Check the IG2 relay.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
12A-1 - 12D-1
|
Battery voltage not applied to terminals 12D-2 and 12E-4
|
10 kΩ or higher
|
Battery voltage applied to terminals 12D-2 and 12E-4
|
Below 1 Ω
|
Text in Illustration
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
| INSPECT NO. 2 INTEGRATION RELAY (DRL) |
 |
Check the DRL fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
DRL fuse
|
Always
|
Below 1 Ω
|
If the result is not as specified, replace the DRL fuse.
Check the DRL relay.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
12A-1 - 12D-6
|
Battery voltage not applied to terminals 12E-12 and 12D-7
|
10 kΩ or higher
|
Battery voltage applied to terminals 12E-12 and 12D-7
|
Below 1 Ω
|
Text in Illustration
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
| INSPECT NO. 2 INTEGRATION RELAY (ACC) |
 |
Check the ACC relay.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
12E-7 - 12E-9
|
Battery voltage not applied to terminals 12E-8 and 12E-4
|
10 kΩ or higher
|
Battery voltage applied to terminals 12E-8 and 12E-4
|
Below 1 Ω
|
Text in Illustration
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
| INSPECT NO. 2 INTEGRATION RELAY (100V) |
 |
Check the 100V fuse.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
100V fuse
|
Always
|
Below 1 Ω
|
If the result is not as specified, replace the 100V fuse.
Check the 100V relay.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
12A-1 - 12E-3
|
Battery voltage not applied to terminals 12E-1 and 12E-4
|
10 kΩ or higher
|
Battery voltage applied to terminals 12E-1 and 12E-4
|
Below 1 Ω
|
Text in Illustration
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
| INSPECT NO. 2 INTEGRATION RELAY (FR FOG) |
 |
Check the FR FOG relay.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
12B-3 - 12B-1
|
Battery voltage not applied to terminals 12B-6 and 12C-4
|
10 kΩ or higher
|
Battery voltage applied to terminals 12B-6 and 12C-4
|
Below 1 Ω
|
Text in Illustration
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
| INSPECT NO. 2 INTEGRATION RELAY (DOME CUT) |
 |
Check the DOME CUT relay.
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
12C-7 - 12C-6
|
Battery voltage not applied to terminals 12C-8 and 12C-5
|
10 kΩ or higher
|
Battery voltage applied to terminals 12C-8 and 12C-5
|
Below 1 Ω
|
Text in Illustration
*a
|
Component without harness connected (No. 2 Integration Relay)
|
If the result is not as specified, replace the No. 2 integration relay.
| INSPECT AIR PUMP HEATER RELAY (AIR PMP HTR) |
 |
- Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
|
Condition
|
Specified Condition
|
3 - 5
|
Battery voltage is not applied to terminals 1 and 2
|
10 kΩ or higher
|
Battery voltage is applied to terminals 1 and 2
|
Below 1 Ω
|
If the result is not as specified, replace the air pump heater relay.