2007-2013 Highlander Kluger · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built Aug 2008 – Jun 2010

Versions by build date: May 2007 – Jul 2008 Aug 2008 – Jun 2010 from Jul 2010


1. INSTALL TRANSMISSION VALVE BODY ASSEMBLY

  1. C050017
    Install the spring and check ball body.

  1. Align the groove of the manual valve with the pin of the lever.

  1. C091933E05
    Install the 17 bolts.

    Torque:
    11 N*m{ 110 kgf*cm , 8 ft.*lbf }

    NOTICE:
    1. Push the valve body against the accumulator piston springs and check ball body to install the valve body.
    2. First, temporarily tighten the bolts marked (1) in the illustration because they are positioning bolts.

    Bolt length:
    Bolt A:
    25 mm (0.98 in.)
    Bolt B:
    57 mm (2.24 in.)
    Bolt C:
    41 mm (1.61 in.)


2. INSTALL VALVE BODY OIL STRAINER ASSEMBLY

  1. C091932
    Coat a new O-ring with ATF.

  1. Install the O-ring to the oil strainer.

  1. C091931
    Install the oil strainer with the 3 bolts.

    Torque:
    11 N*m{ 110 kgf*cm , 8 ft.*lbf }


3. INSTALL TRANSMISSION WIRE

  1. C091927E08
    Coat a new O-ring with ATF.

  1. Install the ATF temperature sensor with the lock plate and bolt.

    Torque:
    6.6 N*m{ 67 kgf*cm , 58 in.*lbf }

  1. Connect the 7 shift solenoid valve connectors.


4. INSTALL AUTOMATIC TRANSAXLE OIL PAN SUB-ASSEMBLY

  1. D030865E03
    Install the 2 magnets in the oil pan.

  1. Apply adhesive to the 18 bolts.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent

  1. C091925
    Install the oil pan and a new gasket to the transaxle case with the 18 bolts.

    Torque:
    7.8 N*m{ 80 kgf*cm , 69 in.*lbf }

    NOTICE:
    Apply adhesive to the bolts and tighten them within 10 minutes of application.


5. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY
(Click here)

6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← INSTALLATION (May 2007 – Jul 2008)INSTALLATION (from Jul 2010) →