ECU Power Source Circuit
Circuit diagnosis · Vehicles built May 2007 – Jul 2008
Versions by build date: May 2007 – Jul 2008 Aug 2008 – Jun 2010 from Jul 2010
DESCRIPTION
This circuit provides power for main body ECU operation.WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. CHECK INSTRUMENT PANEL JUNCTION BLOCK (MAIN BODY ECU (POWER SOURCE)) |
 |
- Disconnect the 1D junction block connector.
Measure the voltage according to the value(s) in the table below.
- Standard voltage:
Tester Connection
|
Specified Condition
|
1D-10 - Body ground
|
11 to 14 V
|
1D-16 - Body ground
|
11 to 14 V
|
|
NG |
 |
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
| OK |
|
 |
|
| 2. CHECK HARNESS AND CONNECTOR (INSTRUMENT PANEL JUNCTION BLOCK - BODY GROUND) |
 |
- Disconnect the 1F and 1M junction block connectors.
Measure the resistance according to the value(s) in the table below.
- Standard resistance:
Tester Connection
|
Specified Condition
|
1F-10 - Body ground
|
Below 1 Ω
|
1M-9 - Body ground
|
Below 1 Ω
|
|
NG |
 |
|
| REPAIR OR REPLACE HARNESS OR CONNECTOR |
|
|
| OK |
|
 |
|
| PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)
|
|