ADJUSTMENT
Removal / installation · Vehicles built from May 2007
| 1. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
Loosen the 2 bolts of the park/neutral position switch and move the shift lever to the N position.

Align the groove with the neutral basic line.
Hold the switch in position and tighten the 2 bolts.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
After adjustment, inspect the park/neutral position switch assembly operation (Click here).
