This is the main power source supplied to the air conditioning amplifier when the ignition switch is on (IG). This power source is used for operating components, such as the air conditioning amplifier and servo motors.
WIRING DIAGRAM
INSPECTION PROCEDURE
1. INSPECT FUSE (A/C NO. 2)
Remove the A/C NO. 2 fuse from the instrument panel junction block.
Measure the resistance of the fuse.
Standard resistance:
Tester Connection
Condition
Specified Condition
A/C NO. 2 fuse
Always
Below 1 Ω
NG
REPLACE FUSE
OK
2. CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BATTERY)
Disconnect the D33 amplifier connector.
Measure the voltage according to the value(s) in the table below.
Standard voltage:
Tester Connection
Condition
Specified Condition
D33-1 (IG+) - Body ground
Ignition switch on (IG)
11 to 14 V
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
3. CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BODY GROUND)
Disconnect the D33 and D34 amplifier connectors.
Measure the resistance according to the value(s) in the table below.
Standard resistance:
Tester Connection
Condition
Specified Condition
D33-14 (GND) - Body ground
Always
Below 1 Ω
D34-20 (GND2)* - Body ground
Always
Below 1 Ω
HINT:
*: w/ Rear Air Conditioning
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)