2007-2013 Highlander Kluger · Service Manual DRIVE LINE

INSTALLATION

Removal / installation · Vehicles built Aug 2008 – Jun 2010

Versions by build date: May 2007 – Jul 2008 Aug 2008 – Jun 2010 from Jul 2010


1. INSTALL TRANSFER RH BEARING RETAINER OIL SEAL

  1. C083629E02
    Using SST, install a new transfer RH bearing retainer oil seal to the transfer case at the position as show in the illustration.
    SST
    09223-46011  

    NOTICE:
    1. Do not install the oil seal obliquely.
    2. Do not damage the oil seal lip.

  1. Apply small amount of MP grease to the oil seal lip.


2. REMOVE FRONT DRIVE SHAFT HOLE SNAP RING
  1. Install a new front drive shaft hole snap ring.


3. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH (for 2WD)
  1. Install the front drive shaft assembly RH.

  1. C167529
    Install a new bearing bracket hole snap ring and bolt.

    Torque:
    32 N*m{ 330 kgf*cm , 24 ft.*lbf }

    NOTICE:
    1. Do not damage the boot or oil seal.
    2. Move the drive shaft assembly while keeping it level.


4. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH (for 4WD)

HINT:
Perform the same procedure as for the LH side.


5. INSTALL FRONT AXLE ASSEMBLY

  1. C165537E05
    Align the matchmarks and install the front drive shaft assembly to the front axle hub sub-assembly.


6. INSTALL NO. 1 FRONT SUSPENSION LOWER ARM

  1. C165928
    Install the No. 1 front suspension lower arm to the front lower ball joint with the bolt and 2 nuts.

    Torque:
    92 N*m{ 938 kgf*cm , 68 ft.*lbf }


7. INSTALL TIE ROD END SUB-ASSEMBLY

  1. C165553E01
    Install the lock nut and the tie rod assembly LH to the steering rack end sub-assembly until the matchmarks are aligned.

    HINT:
    After adjusting toe-in, torque the lock nut.


8. INSTALL FRRONT SPEED SENSOR

  1. C165818E03
    Install the resin clamp and front speed sensor with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    NOTICE:
    1. Prevent foreign matter from attaching to the sensor tip.
    2. Firmly insert the sensor body into the knuckle before tightening the bolt.
    3. After installing the sensor to the knuckle, make sure that there is no clearance between the sensor stay and knuckle. Also make sure that no foreign matter is stuck between the parts.
    4. To prevent interference between the sensor and magnetic rotor, do not rotate the sensor body during or after the insertion of the sensor body to the knuckle.


9. INSTALL FRONT STABILIZER LINK ASSEMBLY

  1. C165915
    Install the front stabilizer link assembly to the front shock absorber with the nut.

    Torque:
    74 N*m{ 755 kgf*cm , 55 ft.*lbf }

    NOTICE:
    If the ball joint turns together with the nut, use a hexagon wrench (6 mm) to hold the stud bolt.


10. INSTALL FRONT AXLE HUB NUT
  1. Clean the threaded parts on the drive shaft and axle hub nut using a non-residue solvent.

    HINT:
    1. Be sure to perform this work for a new drive shaft.
    2. Keep the threaded parts free of oil and foreign objects.

  1. C165538
    Using a socket wrench (30 mm), install a new axle hub nut.

    Torque:
    294 N*m{ 2996 kgf*cm , 216 ft.*lbf }

  1. Using a chisel and hammer, stake the front axle hub nut.


11. INSTALL FRONT WHEEL

Torque:
103 N*m{ 1050 kgf*cm , 76 ft.*lbf }


12. ADD AUTOMATIC TRANSAXLE FLUID

13. INSPECT FLUID LEVEL

14. INSTALL TRANSFER DRAIN PLUG

  1. C082977E05
    Install the transfer drain plug with a new drain gasket.

    Torque:
    49 N*m{ 500 kgf*cm , 36 ft.*lbf }


15. INSTALL NO. 1 TRANSFER CASE PLUG
  1. Add oil up to 0 to 5 mm below the lower side of the plug hole.

    Oil quantity:
    0.9 liters (0.95 US qts, 0.79 lmp.qts)

    HINT:
    When adding oil, pour it slowly.

  1. Install the No. 1 transfer case plug with a new No. 1 gasket.

    Torque:
    49 N*m{ 500 kgf*cm , 36 ft.*lbf }


16. INSPECT EXHAUST GAS LEAK

17. INSTALL NO. 2 ENGINE UNDER COVER

18. INSTALL NO. 1ENGINE UNDER COVER

19. INSTALL ENGINE UNDER COVER ASSEMBLY

20. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT

HINT:
(Click here)


21. CHECK ABS SPEED SENSOR SIGNAL

HINT:
(Click here)

← INSTALLATION (May 2007 – Jul 2008)INSTALLATION (from Jul 2010) →