2007-2013 Highlander Kluger · Service Manual BODY

INSTALLATION

Removal / installation · Vehicles built from Jul 2010

Versions by build date: May 2007 – Jun 2010 from Jul 2010


1. INSTALL REAR WHEEL HOUSE LINER LH

  1. B174758
    Install the rear wheel house liner LH with the 10 clips.


2. INSTALL REAR WHEEL HOUSE LINER RH

  1. B174759
    Install the rear wheel house liner RH with the 10 clips.


3. INSTALL REAR BUMPER SIDE SEAL LH

  1. B174757
    Install 2 new grommets.

  1. Install the rear bumper side seal LH with the clip, bolt and screw.


4. INSTALL REAR BUMPER SIDE SEAL RH

HINT:
Use the same procedure as for the LH side.


5. INSTALL QUARTER PANEL SEAL LH

HINT:
When installing a new quarter panel seal LH, heat the vehicle body and quarter panel seal LH using a heat light.

Heating temperature:
Item
Temperature
Vehicle Body
40 to 60°C (104 to 140°F)
Quarter Panel Seal
20 to 30°C (68 to 86°F)

NOTICE:
Do not heat the vehicle body or quarter panel seal LH excessively.

  1. Clean the vehicle body surface.

    1. Using a heat light, heat the vehicle body surface.

    2. Remove the double-sided tape from the vehicle body.

    3. Wipe off any tape adhesive residue with cleaner.

  1. B174756E01
    Install a new quarter panel seal LH.

    1. Using a heat light, heat the vehicle body and a new quarter panel seal LH.

    2. Remove the release paper from the quarter panel seal LH.

      HINT:
      After removing the release paper, keep the exposed adhesive free from foreign matter.

    3. Install the quarter panel seal LH with the 4 screws.


6. INSTALL QUARTER PANEL SEAL RH

HINT:
Use the same procedure as for the LH side.


7. INSTALL REAR WHEEL HOUSE PAD LH

  1. B174755
    Install the rear wheel house pad LH with the 3 screws.


8. INSTALL REAR WHEEL HOUSE PAD RH

HINT:
Use the same procedure as for the LH side.


9. INSTALL REAR QUARTER PANEL MUDGUARD LH

  1. B261562E01
    Install the 2 screws (A).

  1. Using a 4 mm hexagon wrench, install the 3 screws (B).


10. INSTALL REAR QUARTER PANEL MUDGUARD RH

HINT:
Use the same procedure as for the LH side.

← INSTALLATION (May 2007 – Jun 2010)COMPONENTS (May 2007 – Jun 2010) →