2007-2013 Highlander Kluger · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jul 2010

Versions by build date: May 2007 – Jul 2008 Aug 2008 – Jun 2010 from Jul 2010


1. INSTALL INTAKE AIR RESONATOR

  1. A170886
    Tighten the bolt to install the intake air resonator.


2. INSTALL NO. 1 AIR CLEANER HOSE

  1. A171940E01
    Align the tab on the air cleaner cap with the groove on the air cleaner hose and tighten the bolt.

    HINT:
    1. A = 30°
    2. B = 11 to 14 mm (0.433 in. to 0.551 in.)


3. INSTALL NO. 3 INTAKE AIR CONTROL VALVE ASSEMBLY

  1. A170448
    Engage the 2 claws and install the No. 3 intake air control valve assembly.


4. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

  1. A170450
    Install the air cleaner case with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the hose and connector.


5. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

  1. A171941E01
    Install the air cleaner filter element, align the groove on the air cleaner hose with the throttle body alignment tab and tighten the clamp as shown in the illustration.

    HINT:
    1. A = 30°
    2. B = 11 to 14 mm (0.433 in. to 0.551 in.)

  1. Install the air cleaner cap with the 2 bolts and clips.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. A170887
    Connect the 3 vacuum hoses.

  1. A171944
    Connect the mass air flow meter connector.

  1. Connect the No. 2 ventilation hose and fuel vapor feed hose assembly.


6. INSTALL NO. 1 AIR CLEANER INLET

  1. A170454E01
    Install the No. 1 air cleaner inlet with the 2 bolts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf } [A]

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf } [B]

  1. Connect the 2 vacuum hoses.


7. INSTALL NO. 2 AIR CLEANER INLET

  1. A170453
    Install the No. 2 air cleaner inlet with the 2 bolts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }

  1. Connect the 2 vacuum hoses and harness clamps.


8. INSTALL BATTERY

NOTICE:
When reconnected the cable, some systems need to be initialized. (Click here).

  1. A175880E02
    Install the battery tray and battery.

  1. Install the battery clamp with the bolt and nut.

    Torque:
    Bolt:
    5.4 N*m{ 55 kgf*cm , 47 in.*lbf }
    Nut A:
    5.4 N*m{ 55 kgf*cm , 47 in.*lbf }

  1. Connect the positive battery terminal, and tighten the nut.

    Torque:
    Nut B:
    6.4 N*m{ 64 kgf*cm , 57 in.*lbf }

  1. Connect the negative battery terminal, and tighten the nut.

    Torque:
    Nut C:
    6.4 N*m{ 64 kgf*cm , 57 in.*lbf }


9. INSTALL COOL AIR INTAKE DUCT SEAL

  1. A170196
    Install the cool air intake duct seal with the 11 clips.

← INSTALLATION (Aug 2008 – Jun 2010)COMPONENTS (May 2007 – Jun 2010) →