2007-2013 Highlander Kluger · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jul 2010

Versions by build date: May 2007 – Jul 2008 Aug 2008 – Jun 2010 from Jul 2010


1. INSTALL VENTILATION VALVE SUB-ASSEMBLY

  1. A105280E05
    Install the PCV valve.

    1. Apply adhesive to 2 or 3 threads.

      Adhesive:
      Toyota genuine adhesive 1324, three bond 1324 or equivalent

    2. A175274E01
      Install the PCV valve.

      Torque:
      27 N*m{ 275 kgf*cm , 20 ft.*lbf }


2. INSTALL PCV HOSE

  1. A175273E01
    Connect the PCV hose to the PCV valve.


3. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A162365
    Fit the 3 retainers and install the V-bank cover.

← INSTALLATION (Aug 2008 – Jun 2010)PARTS LOCATION (from May 2007) →