ENGINE UNIT > INSPECTION |
| 1. INSPECT NO. 1 VALVE ROCKER ARM SUB-ASSEMBLY |
![]() |
Turn the roller by hand to check that it turns smoothly.
| 2. INSPECT VALVE LASH ADJUSTER ASSEMBLY |
Place the valve lash adjuster assembly into a container filled with engine oil.
![]() |
Insert the tip of SST into the valve lash adjuster assembly's plunger and use the tip to press down on the check ball inside the plunger.
Squeeze SST and valve lash adjuster assembly together to move the plunger up and down 5 to 6 times.
Check the movement of the plunger and bleed the air.
After bleeding the air, remove SST. Then try to quickly and firmly press the plunger with by hand.
| 3. INSPECT CAMSHAFT |
Inspect the camshaft for runout.
Place the camshaft on V-blocks.
![]() |
Using a dial indicator, measure the circle runout at the center journal.
![]() |
Using a micrometer, measure the cam lobe height.
| Item | Specification |
| Intake camshaft | 44.316 to 44.416 mm (1.7447 to 1.7487 in.) |
| Exhaust camshaft | 44.262 to 44.362 mm (1.7426 to 1.7465 in.) |
| Item | Specification |
| Intake camshaft | 44.166 mm (1.7388 in.) |
| Exhaust camshaft | 44.112 mm (1.7367 in.) |
![]() |
Using a micrometer, measure the journal diameter.
| Item | Specification |
| No. 1 journal | 35.946 to 35.960 mm (1.4152 to 1.4157 in.) |
| Other journals | 25.959 to 25.975 mm (1.0220 to 1.0226 in.) |
| 4. INSPECT CAMSHAFT TIMING GEAR ASSEMBLY |
Clamp the camshaft in a vise.
![]() |
Put the camshaft timing gear assembly and camshaft together by aligning the key groove and straight pin.
Lightly press and turn the camshaft timing gear assembly against the camshaft, and then press harder after the pin enters the groove.
Check that there is no clearance between the camshaft timing gear assembly's flange and the camshaft.
![]() |
Tighten the flange bolt with the camshaft timing gear assembly fixed.
Check the lock of the camshaft timing gear assembly.
Clamp the camshaft in a vise, and confirm that the camshaft timing gear assembly is locked.
![]() |
Release the lock pin.
Cover the 4 oil paths of the cam journal with vinyl tape as shown in the illustration.
Break through the tape on the advance side path and the retard side path on the opposite side of the hole of the advance side path, as shown in the illustration.
![]() |
Apply approximately 200 kPa (2.0 kgf/cm2, 28 psi) of air pressure to the 2 opened paths.
![]() |
Check that the camshaft timing gear assembly rotates in the advance direction when reducing the air pressure applied to the retard side path.
When the camshaft timing gear assembly reaches the most advanced position, release the air pressure first from the retard side path and next from advance side path.
Check for smooth rotation.
Turn the camshaft timing gear assembly within its movable range (21°) 2 or 3 times, but do not turn it to the most retarded position. Make sure that the gear turns smoothly.
Check the lock in the most retarded position.
Confirm that the camshaft timing gear assembly locks at the most retarded position.
![]() |
Remove the flange bolt and camshaft timing gear assembly.
| 5. INSPECT CAMSHAFT TIMING EXHAUST GEAR ASSEMBLY LH |
Clamp the camshaft in a vise.
![]() |
Put the camshaft timing exhaust gear assembly LH and camshaft together by aligning the key groove and straight pin.
Lightly press and turn the camshaft timing gear assembly LH against the camshaft, press harder after the pin enters the groove.
Check that there is no clearance between the gear's flange and the camshaft.
![]() |
Tighten the flange bolt with the camshaft timing exhaust gear assembly LH fixed.
Check the camshaft timing exhaust gear lock.
Make sure that the camshaft timing exhaust gear assembly LH locks.
![]() |
Release the lock pin.
Cover the 4 oil paths of the cam journal with vinyl tape as shown in the illustration.
Break through the tape on the advance side path and the retard side path on the opposite side of the hole of the advance side path, as shown in the illustration.
![]() |
Apply approximately 200 kPa (2.0 kgf/cm2, 28 psi) of air pressure to the 2 opened paths (the advance side path and the retard side path).
![]() |
Make sure that the camshaft timing exhaust gear assembly LH turns in the retard direction when reducing the air pressure applied to the advance side path.
When the camshaft timing exhaust gear assembly LH moves to the most retarded position, release the air pressure first from the advance side path, and then release the air pressure from the retard side path.
Check for smooth rotation.
Turn the camshaft timing exhaust gear assembly LH within its movable range (18.5°) 2 or 3 times, but do not turn it to the most advanced position. Make sure that the gear assembly turns smoothly.
Check the lock at the most advanced position.
Make sure that the camshaft timing exhaust gear assembly LH locks at the most advanced position.
![]() |
Remove the flange bolt and camshaft timing exhaust gear assembly LH.
| 6. INSPECT CYLINDER HEAD SET BOLT |
![]() |
Using a vernier caliper, measure the minimum diameter of the elongated thread at the measuring point.
| 7. INSPECT CHAIN SUB-ASSEMBLY |
![]() |
Pull the chain sub-assembly with a force of 147 N (15 kgf, 33 lbf) as shown in the illustration.
Using a vernier caliper, measure the length of 15 links.
| 8. INSPECT NO. 2 CHAIN SUB-ASSEMBLY |
![]() |
Pull the chain with a force of 147 N (15 kgf, 33 lbf) as shown in the illustration.
Using a vernier caliper, measure the length of 15 links.
| 9. INSPECT CRANKSHAFT TIMING SPROCKET |
Wrap the chain around the sprocket.
![]() |
Using a vernier caliper, measure the sprocket diameter with the chain sub-assembly.
| 10. INSPECT IDLE SPROCKET ASSEMBLY |
Wrap the chain around the sprocket.
![]() |
Using a vernier caliper, measure the sprocket diameter with the chain.
| 11. INSPECT IDLE GEAR SHAFT OIL CLEARANCE |
![]() |
Using a micrometer, measure the idle gear shaft diameter.
![]() |
Using a caliper gauge, measure the inside diameter of the idle sprocket assembly.
Subtract the idle gear shaft diameter measurement from the idle sprocket inside diameter measurement.
| 12. INSPECT NO. 1 CHAIN TENSIONER ASSEMBLY |
![]() |
Move the stopper plate upward to release the lock. Push the plunger and check that it moves smoothly.
If necessary, replace the No. 1 chain tensioner assembly.
| 13. INSPECT NO. 2 CHAIN TENSIONER ASSEMBLY |
![]() |
Check that the plunger moves smoothly.
Measure the worn depth of the No. 2 chain tensioner assembly.
| 14. INSPECT NO. 3 CHAIN TENSIONER ASSEMBLY |
![]() |
Check that the plunger moves smoothly.
Measure the worn depth of the No. 3 chain tensioner assembly.
| 15. INSPECT CHAIN TENSIONER SLIPPER |
![]() |
Measure the worn depth of the chain tensioner slipper.
| 16. INSPECT NO. 1 CHAIN VIBRATION DAMPER |
![]() |
Measure the worn depth of the No. 1 chain vibration damper.
| 17. INSPECT NO. 2 CHAIN VIBRATION DAMPER |
![]() |
Measure the worn depth of the No. 2 chain vibration damper.
| 18. INSPECT CAMSHAFT THRUST CLEARANCE |
Inspect the bank 1 camshaft thrust clearance.
Install the bank 1 camshaft .
![]() |
Using a dial indicator, measure the thrust clearance while moving the camshaft back and forth.
Inspect the bank 2 camshaft thrust clearance.
Install the bank 2 camshaft .
Using a dial indicator, measure the thrust clearance while moving the camshaft back and forth.
| 19. INSPECT CAMSHAFT OIL CLEARANCE |
Clean the camshaft bearing caps, camshaft housing and camshaft journals.
Place the camshafts on the camshaft housing.
![]() |
Lay a strip of Plastigage across each of the camshaft journals.
Install the camshaft bearing caps (Click here for Bank 1, Click here for Bank 2).
Remove the camshaft bearing caps (Click here for Bank 1, Click here for Bank 2).
![]() |
Measure the Plastigage at its widest point.
| Item | Oil Clearance |
| No. 1 journal | 0.040 to 0.079 mm (0.0016 to 0.0031 in.) |
| Other journals | 0.025 to 0.062 mm (0.00098 to 0.0024 in.) |
| Item | Oil Clearance |
| No. 1 journal | 0.10 mm (0.0039 in.) |
| Other journals | 0.09 mm (0.0035 in.) |
Clean the camshaft bearing caps, camshaft housing and camshaft journals.
Place the camshafts on the camshaft housing.
![]() |
Lay a strip of Plastigage across each camshaft journal.
Install the camshaft bearing caps (Click here for Bank 1, Click here for Bank 2).
Remove the camshaft bearing caps (Click here for Bank 1, Click here for Bank 2).
![]() |
Measure the Plastigage at its widest point.
| Item | Oil Clearance |
| No. 1 journal | 0.040 to 0.079 mm (0.0016 to 0.0031 in.) |
| Other journals | 0.025 to 0.062 mm (0.00098 to 0.0024 in.) |
| Item | Oil Clearance |
| No. 1 journal | 0.10 mm (0.0039 in.) |
| Other journals | 0.09 mm (0.0035 in.) |