Home › BODY ELECTRICAL › METER › METER / GAUGE SYSTEM

METER / GAUGE SYSTEM > Entire Combination Meter does not Operate

for Preparation Click here


DESCRIPTION

This circuit is the power source circuit for the meter. This circuit provides two types of power sources; one is a constant power source mainly used as a backup power source, and the other is a power source mainly used for signal transmission. The constant power source is mainly used as a backup power source of the meter CPU, however, it is also used for communication. If a voltage of 12 V is not applied to terminal IG+ when the ignition switch is on (IG), the indicator will not operate.

WIRING DIAGRAM


E146954E04


INSPECTION PROCEDURE

1.INSPECT COMBINATION METER ASSEMBLY


    E146920E01
  1. Disconnect the E1 connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Condition
    Specified Condition
    E1-20 (ES) - Body ground
    Always
    Below 1 Ω
    E1-40 (E2) - Body ground
    Always
    Below 1 Ω

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    Condition
    Specified Condition
    E1-1 (IG+) - Body ground
    Ignition switch on (IG)
    10 to 14 V
    E1-21 (B) - Body ground
    Always
    10 to 14 V
    E1-22 (B2) - Body ground
    Always
    10 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE COMBINATION METER ASSEMBLY (Click here)