Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › AIR CONDITIONING SYSTEM (for Manual Air Conditioning System)

AIR CONDITIONING SYSTEM (for Manual Air Conditioning System) > IG Power Source Circuit

for Preparation Click here


DESCRIPTION

This is the main power source supplied to the air conditioning amplifier when the ignition switch is on (IG). This power source is used for operating components, such as the air conditioning amplifier and servo motors.

WIRING DIAGRAM


E153863E03


INSPECTION PROCEDURE

1.INSPECT FUSE (A/C NO. 2)
  1. Remove the A/C NO. 2 fuse from the instrument panel junction block.

  1. Measure the resistance of the fuse.

    Standard resistance:
    Below 1 Ω



NG
REPLACE FUSE
OK


2.CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BATTERY)


    E143742E77
  1. Disconnect the D37 amplifier connector.

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    Condition
    Specified Condition
    D37-1 (IG+) - Body ground
    Ignition switch on (IG)
    11 to 14 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


3.CHECK HARNESS AND CONNECTOR (AIR CONDITIONING AMPLIFIER - BODY GROUND)


    E143742E78
  1. Disconnect the D37 amplifier connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Tester Display
    Specified Condition
    D37-14 (GND) - Body ground
    Measurement Item/Range
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)