Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › AIR CONDITIONING SYSTEM (for Manual Air Conditioning System)

AIR CONDITIONING SYSTEM (for Manual Air Conditioning System) > Heater Control Panel Power Source Circuit

for Preparation Click here


DESCRIPTION

Battery voltage is supplied to the heater control panel (A/C control assembly) through the A/C No. 2 fuse.

WIRING DIAGRAM


E154319E03


INSPECTION PROCEDURE

1.CHECK HARNESS AND CONNECTOR (IG+ - BODY GROUND)


    E152690E20
  1. Disconnect the connector from the heater control panel.

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    Condition
    Specified Condition
    E10-2 (IG+) - Body ground
    Ignition switch on (IG)
    11 to 14 V
    E10-2 (IG+) - Body ground
    Ignition switch off
    Below 1 V

    Result:
    Result
    Proceed to
    OK
    A
    NG (without Smart key system)
    B
    NG (with Smart key system)
    C



B
GO TO STARTING SYSTEM

C
GO TO PUSH BUTTON START SYSTEM
A


2.CHECK HARNESS AND CONNECTOR (GND - BODY GROUND)


    E152690E09
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Condition
    Specified Condition
    E10-10 (GND) - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)