Home › DRIVE LINE › MF2A TRANSFER › TRANSFER ASSEMBLY

TRANSFER ASSEMBLY > INSPECTION

for Preparation Click here



1. INSPECT PRELOAD


    C083635E11
  1. Using SST and a torque wrench, check the initial torque within the backlash range.

    SST
    09326-20011  

    Torque:
    0.9 to 1.4 N*m{ 9 to 14 kgf*cm , 8.0 to 12.4 in.*lbf }

    HINT:
    Use a torque wrench with a fulcrum length of 160 mm (6.30 in.).

  1. Using SST and a torque wrench, check the initial torque while the driven pinion is in contact with the ring gear face.

    SST
    09326-20011  

    Torque:
    Preload:
    1.07 to 1.68 N*m{ 10.9 to 17.1 kgf*cm , 9.5 to 14.9 in.*lbf }

    HINT:
    Use a torque wrench with a fulcrum length of 160 mm (6.30 in.).



2. INSPECT DIFFERENTIAL RING GEAR BACKLASH


    C050309
  1. Set the dial gauge perpendicular to the tooth face of the ring gear, fix the driven pinion and inspect the backlash while moving the gear.

    Backlash:
    0.08 to 0.15 mm (0.0031 to 0.0059 in.)

    NOTICE:
    Inspect it at 3 points or more on the gear's periphery.



3. INSPECT TOOTH CONTACT BETWEEN RING GEAR AND DRIVE PINION


    C050346
  1. Apply Prussian blue thinly and uniformly to both faces of the ring gear and rotate several times.

    NOTICE:
    Inspect the tooth contact on the ring gear at 4 places or more.



4. INSPECT RUNOUT OF TRANSFER RING GEAR MOUNTING CASE


    C099000
  1. Using a dial gauge check the transfer ring gear mounting case runout.

    Maximum runout:
    0.03 mm (0.0012 in.)