Home › ENGINE › 2GR-FE EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL VENTILATION VALVE SUB-ASSEMBLY


    A105280E05
  1. Install the PCV valve.

    1. Apply adhesive to 2 or 3 threads.

      Adhesive:
      Part No. 08833-00070, THREE BOND 1324 or equivalent.



    2. A175274E01
    3. Install the PCV valve.

      Torque:
      27 N*m{ 275 kgf*cm , 20 ft.*lbf }



2. INSTALL PCV HOSE


    A175273E01
  1. Connect the PCV hose to the PCV valve.



3. INSTALL V-BANK COVER SUB-ASSEMBLY


    A162365
  1. Fit the 3 retainers and install the V-bank cover.