Home › ENGINE › 2GR-FE EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PURGE VSV


    A132953
  1. Install the purge VSV with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A175271
  1. Connect the wire harness clamp.

  1. Connect the 2 vacuum hoses and purge VSV connector.



2. INSTALL V-BANK COVER SUB-ASSEMBLY


    A162365
  1. Fit the 3 retainers and install the V-bank cover.