Home › ENGINE › 2GR-FE EMISSION CONTROL › PURGE VALVE

PURGE VALVE > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER SUB-ASSEMBLY


    A162365
  1. Hold the front of the V-bank cover and raise it to disengage the 2 clips on the front of the V-bank cover sub-assembly. Continue rising the V-bank cover sub-assembly to disengage the clip on the rear of the V-bank cover sub-assembly and remove the cover.

    NOTICE:
    Attempting to disengage both front and rear clips at the same time may cause the V-bank cover sub-assembly to break.



2. REMOVE PURGE VSV


    A175271
  1. Disconnect the 2 vacuum hoses and purge VSV connector.

  1. Disconnect the wire harness clamp.



    A132953
  1. Remove the bolt and purge VSV.