CYLINDER HEAD GASKET (for Bank 2) > INSTALLATION |
| 1. INSTALL NO. 2 CYLINDER HEAD GASKET |
![]() |
Place the No. 2 cylinder head gasket on the cylinder block surface with the Lot No. stamp upward.
| 2. INSTALL CYLINDER HEAD SUB-ASSEMBLY LH |
Place the cylinder head on the cylinder block.
Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.
Step 1
![]() |
Using a 10 mm bi-hexagon wrench, install and uniformly tighten the 8 cylinder head bolts with the plate washers in several steps in the sequence shown in the illustration.
![]() |
Step 2
Mark the cylinder head bolt head with paint as shown in the illustration.
Tighten the cylinder head bolts another 90°.
Step 3
Tighten the cylinder head bolts an additional 90°.
Check that the painted mark is now facing rearward.
![]() |
Tighten the 2 bolts in the order shown in the illustration.
| 3. INSTALL VALVE STEM CAP |
Install the 12 valve stem caps.
| 4. INSTALL VALVE LASH ADJUSTER ASSEMBLY |
Place the lash adjuster into a container filled with engine oil.
![]() |
Insert the tip of SST into the lash adjuster's plunger and use the tip to press down on the check ball inside the plunger.
Squeeze SST and lash adjuster together to move the plunger up and down 5 to 6 times.
Check the movement of the plunger and bleed the air.
After bleeding the air, remove SST. Then, try to press the plunger quickly and firmly with by hand.
Install the lash adjusters.
| 5. INSTALL CAMSHAFT BEARING CAP |
Apply engine oil to the camshaft journals, camshaft housing sub-assembly LH and camshaft bearing caps.
Install the No. 3 camshaft and No. 4 camshaft to the camshaft housing sub-assembly LH.
![]() |
Make sure to install camshaft bearing caps in each proper position and direction according to the painted marks and numbers.
![]() |
Temporarily tighten the 8 bolts in the order shown in the illustration.
| 6. INSTALL CAMSHAFT HOUSING SUB-ASSEMBLY LH |
![]() |
Make sure that the valve rocker arm is installed as shown in the illustration.
![]() |
Apply seal packing in a continuous line as shown in the illustration.
![]() |
Install the camshaft housing sub-assembly LH and tighten the 13 bolts in the order shown in the illustration.
![]() |
Tighten the 8 bolts in the order shown in the illustration.
| 7. INSTALL NO. 3 CHAIN TENSIONER ASSEMBLY |
![]() |
Install the No. 3 chain tensioner assembly with the bolt.
While pushing in the tensioner, insert a pin of 1.0 mm diameter (0.0394 in.) into the hole to hold it.
| 8. INSTALL CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (for Bank 2) |
![]() |
Align the mark plates (yellow) with the timing marks of the camshaft timing gear assemblies as shown in the illustration.
Apply a light coat of engine oil to the bolt threads and bolt-seating surface.
Align the knock pin of the camshaft with the pin hole of the camshaft timing gear assembly. Install the camshaft timing gear assembly and camshaft timing exhaust gear LH with the No. 2 chain sub-assembly installed.
![]() |
Using SST to hold the hexagonal portion of each camshaft, tighten the flange bolts of the camshaft timing gear assembly and the camshaft timing exhaust gear assembly LH.
Remove the pin from the No. 3 chain tensioner assembly.
| 9. INSTALL NO. 2 CHAIN VIBRATION DAMPER |
Install the 2 No. 2 chain vibration dampers.
| 10. INSTALL IDLE SPROCKET ASSEMBLY |
![]() |
Apply a light coat of engine oil to the rotating surface of the No. 1 idle gear shaft.
Temporarily install the No. 1 idle gear shaft and idle sprocket with the No. 2 idle gear shaft while aligning the knock pin of the No. 1 idle gear shaft with the knock pin groove of the cylinder block.
Using a 10 mm hexagon wrench, tighten the No. 2 idle gear shaft.
| 11. INSTALL CHAIN SUB-ASSEMBLY |
![]() |
Align the mark plate and timing marks as shown in the illustration and install the chain.
![]() |
Do not pass the chain over the crankshaft, just temporarily place it on the crankshaft.
![]() |
Turn the camshaft timing gear assembly on bank 1 counterclockwise to tighten the chain between the banks.
![]() |
Align the mark plate and timing marks as shown in the illustration and install the chain onto the crankshaft timing sprocket.
Temporarily tighten the pulley set bolt.
![]() |
Turn the crankshaft clockwise to set it to the RH block bore center line (TDC/compression).
| 12. INSTALL CHAIN TENSIONER SLIPPER |
Install the chain tensioner slipper.
| 13. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY |
![]() |
Move the stopper plate upward to release the lock, and push the plunger deep into the tensioner.
Move the stopper plate downward to set the lock, and insert a hexagon wrench into the hole of the stopper plate.
![]() |
Install the No. 1 chain tensioner assembly with the 2 bolts.
Remove the hexagon wrench from the No. 1 chain tensioner assembly.
Check the camshaft timing marks.
Check that each camshaft timing mark is positioned as shown in the illustration.


If the valve timing is misaligned, reinstall the timing chain.
Remove the pulley set bolt.
| 14. INSTALL TIMING CHAIN CASE OIL SEAL |
![]() |
Using SST, tap in a new timing chain case oil seal until its surface is flush with the timing gear case edge.
| 15. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY |
Apply seal packing in a continuous line to the engine unit as shown in the following illustration.

Apply seal packing in a continuous line to the timing chain cover as shown in the following illustration.

| Area | Seal Packing Diameter | Application Position from Inside Seal Line |
| Continuous Line Area | 4.5 mm or more (0.177 in.) | 3.0 to 4.0 mm (0.118 to 0.157 in.) |
| Alternate Long and Dashed Line Area | 3.5 mm or more (0.138 in.) | 2.0 to 3.0 mm (0.079 to 0.118 in.) |
| Dashed Line Area | 3.5 mm or more (0.138 in.) | 3.0 to 4.0 mm (0.118 to 0.157 in.) |
| Diagonal Line Area | 6.0 mm or more (0.236 in.) | 5.0 mm (0.197 in.) |
![]() |
Install a new gasket.
![]() |
Align the oil pump's drive rotor spline and the crankshaft as shown in the illustration. Install the spline and chain cover to the crankshaft.
Temporarily tighten the timing chain cover with the 23 bolts and 2 nuts.

| Item | Length |
| Bolt A | 40 mm (1.57 in.) |
| Bolt B | 55 mm (2.17 in.) |
| Bolt C | 25 mm (0.98 in.) |
Fully tighten the bolts in this order: Area 1 and Area 2.
Fully tighten the bolts in Area 3.
Fully tighten the bolts in Area 4.
Install a new chain cover plate gasket and the chain cover plate with the 4 bolts.
| 16. INSTALL OIL PAN SUB-ASSEMBLY |
When replacing a stud bolt, install it by using an E8 "TORX" socket wrench.

![]() |
Install 2 new O-rings.
![]() |
Apply seal packing in a continuous line as shown in the illustration.
![]() |
Install the oil pan with the 16 bolts and 2 nuts.
| 17. INSTALL OIL STRAINER SUB-ASSEMBLY |
![]() |
Using an E6 "TORX" socket, install the stud bolts as shown in the illustration.
![]() |
Install a new gasket and the oil strainer sub-assembly with the bolt and 2 nuts.
| 18. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY |
![]() |
Using an E6 "TORX" socket, install the stud bolts as shown in the illustration.
![]() |
Apply seal packing in a continuous line as shown in the illustration.
![]() |
Install the No. 2 oil pan sub-assembly with the 16 bolts and 2 nuts.
| 19. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY (for Bank 1) |
![]() |
Apply seal packing as shown in the illustration.
![]() |
Install 3 new gaskets as shown in the illustration.
Install a new gasket to the head cover.
![]() |
Install a head cover with the 12 bolts and a new seal washer.
| 20. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY (for Bank 2) |
![]() |
Apply seal packing as shown in the illustration.
![]() |
Install 3 new gaskets as shown in the illustration.
Install a new cylinder head cover gasket to the cylinder head cover sub-assembly.
![]() |
Install the cylinder head cover sub-assembly with the 12 bolts and a new seal washer.
| 21. INSTALL WATER OUTLET |
![]() |
Install 2 new gaskets and a new O-ring.
![]() |
Install the water outlet with the 2 bolts and 4 nuts.
| 22. INSTALL WATER INLET HOUSING |
![]() |
Install 2 new O-rings.
![]() |
Install the 2 stud bolts.
![]() |
Install the water inlet housing with the 2 bolts and nut.
Connect the No. 1 water by-pass hose.
Apply adhesive around the drain cock.
Install the drain cock assembly to the water inlet housing.
Install the drain cock plug to the drain cock assembly.
Install a new gasket to the thermostat.
![]() |
Align the thermostat jiggle valve with the upper stud bolt, and insert the thermostat in the water inlet housing.
![]() |
Install the water inlet with the 2 nuts.
| 23. INSTALL NO. 1 OIL COOLER BRACKET (w/ Oil Cooler) |
![]() |
Using an E8 "TORX" socket, install the 2 stud bolts as shown in the illustration.
![]() |
Install a new gasket to the No. 1 oil cooler bracket.
Install the oil cooler pipe with the bolt and 2 nuts.
![]() |
Install a new gasket to the No. 1 oil pan.
Install the No. 1 oil cooler bracket with oil cooler pipe with the 3 bolts and 3 nuts.
| 24. INSTALL OIL COOLER ASSEMBLY (w/ Oil Cooler) |
![]() |
Install a new O-ring.
Install the oil cooler assembly with the union bolt.
![]() |
Install the 2 water by-pass hoses with the bolt, 2 clamps, and 4 clips.
| 25. INSTALL CRANKSHAFT PULLEY |
Align the pulley set key with the key groove of the pulley, and slide on the pulley.
![]() |
Using SST, install the pulley bolt.
| 26. INSTALL OIL PIPE |
Make sure that there is no foreign matter on the mesh of the oil control valve filter RH.
![]() |
Install a new gasket and temporarily install the oil pipe (on the cylinder head side) with the oil pipe union bolt.
Install the oil control valve filter RH to the oil pipe union. Install new gaskets and temporarily install the oil pipe (on the head cover side).
Tighten the oil pipe union (on the cylinder head side).
Tighten the oil pipe union (on the head cover side).
Install the bolt (A) to the cylinder head.
| 27. INSTALL NO. 1 OIL PIPE |
Make sure that there is no foreign matter on the mesh of the oil control valve filter LH.
![]() |
Install a new gasket and temporarily install the oil pipe (on the cylinder head side) with the oil pipe union bolt.
Install the oil control valve filter LH to the oil pipe union. Install new gaskets and temporarily install the oil pipe (on the head cover side).
Tighten the oil pipe union (on the cylinder head side).
Tighten the oil pipe union (on the head cover side).
| 28. INSTALL CRANKSHAFT POSITION SENSOR |
![]() |
Install the crankshaft position sensor with the bolt.
| 29. INSTALL KNOCK CONTROL SENSOR |
![]() |
Install the 2 knock control sensors with the 2 bolts as shown in the illustration.
Connect the 2 knock control sensor connectors.
| 30. INSTALL KNOCK CONTROL SENSOR WIRE |
![]() |
Connect the 2 knock control sensor connectors and 3 clamps.
| 31. INSTALL NO. 1 VACUUM SWITCHING VALVE |
![]() |
Install the bolt and No. 1 vacuum switching valve.
| 32. INSTALL RADIO SETTING CONDENSER |
![]() |
Install the 2 bolts and 2 radio setting condensers.
| 33. INSTALL NO. 1 ENGINE FRONT MOUNTING BRACKET LH |
![]() |
Install the No. 1 front engine mounting bracket LH with the 6 bolts.
| 34. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the idler pulley cover plate, No. 2 idler pulley sub-assembly and No. 2 idler pulley cover plate with the bolt.
| 35. INSTALL NO. 2 TIMING GEAR COVER |
![]() |
Install the No. 2 timing gear cover with the 2 bolts.
| 36. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
Temporarily install the V-ribbed belt tensioner assembly with the 5 bolts.
Install the V-ribbed belt tensioner assembly by tightening the bolt 1 and bolt 2 in the order shown in the illustration.
Tighten the other bolts.
| 37. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the wire harness clamp stay with the bolt.
![]() |
Connect the generator bracket with the wire harness clamp.
![]() |
Install generator assembly with the 2 bolts.
![]() |
Temporally install the 2 bolts.
![]() |
Fully tighten the 2 bolts.
![]() |
Connect the generator connector to the generator assembly.
Install the generator wire with the nut.
Install the terminal cap.
Connect the 3 wire harness clamps.
Connect the magnetic clutch connector to the compressor and magnetic clutch.
| 38. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET |
![]() |
Install the transverse engine mounting bracket with the 3 bolts.
| 39. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH |
![]() |
Install a new gasket as shown in the illustration.
![]() |
Install the exhaust manifold sub-assembly LH with the 6 nuts in the order shown in the illustration.
| 40. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR |
![]() |
Install the No. 2 exhaust manifold heat insulator with the 3 bolts.
| 41. INSTALL NO. 2 MANIFOLD STAY |
![]() |
Install the No. 2 manifold stay with the bolt and nut in the order shown in the illustration.
| 42. INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE |
![]() |
Install a new O-ring to the No. 2 engine oil level dipstick guide.
Apply a light coat of engine oil to the O-rings.
Push in the No. 2 engine oil level dipstick guide end into the No. 1 engine oil level dipstick guide.
![]() |
Install the No. 2 engine oil level dipstick guide with the bolt.
Install the engine oil level dipstick.
| 43. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH |
![]() |
Install a new gasket as shown in the illustration.
![]() |
Install the exhaust manifold sub-assembly RH with the 6 nuts in the order shown in the illustration.
| 44. INSTALL INTAKE MANIFOLD |
| Tightening Parts | ||
| Intake Manifold and Cylinder Head Sub-assembly RH | ||
| Intake Manifold and Cylinder Head Sub-assembly LH |
![]() |
Set a new gasket on each cylinder head.
Set the intake manifold on the cylinder heads.
Install and tighten the 6 bolts and 4 nuts uniformly in several steps.
| 45. INSTALL NO. 2 ENGINE MOUNTING STAY RH |
| Tightening Parts | ||
| Intake Manifold and Cylinder Head Sub-assembly RH | ||
| Intake Manifold and Cylinder Head Sub-assembly LH |
![]() |
Set a new gasket on each cylinder head.
Set the intake manifold on the cylinder heads.
Install and tighten the 6 bolts and 4 nuts uniformly in several steps.
| 46. INSTALL IGNITION COIL ASSEMBLY |
![]() |
Install the 6 ignition coils with the 6 bolts.
Connect the 6 ignition coil connectors.
![]() |
Install the 4 bolts [A].
Install the nut [B].
Install the 2 clamps [C].
| 47. REMOVE ENGINE STAND |
| 48. INSTALL ENGINE ASSEMBLY |