Home › ENGINE › 3MZ-FE EXHAUST › EXHAUST PIPE

EXHAUST PIPE > REMOVAL

for Preparation Click here



1. REMOVE NO. 1 ENGINE UNDER COVER
  1. Remove the 6 bolts, 2 screws, 2 clips and No. 1 engine under cover.



2. REMOVE NO. 2 ENGINE UNDER COVER
  1. Remove the 4 bolts and No. 2 engine under cover.



3. REMOVE OXYGEN SENSOR (for Bank 1)
  1. Disconnect the oxygen sensor connector and clamp.



    A173496E01
  1. Using SST, remove the oxygen sensor from the front No. 3 exhaust pipe sub-assembly.

    SST
    09224-00010  

    NOTICE:
    Do not damage the oxygen sensor.



4. REMOVE OXYGEN SENSOR (for Bank 2)
  1. Disconnect the oxygen sensor connector.



    A173494E01
  1. Using SST, remove the oxygen sensor from the front exhaust pipe sub-assembly.

    SST
    09224-00010  

    NOTICE:
    Do not damage the oxygen sensor.



5. REMOVE TAIL EXHAUST PIPE ASSEMBLY


    A176008
  1. Remove the 2 bolts and 2 compression springs.

  1. Remove the tail exhaust pipe assembly from the exhaust pipe support.

  1. Remove the gasket from the center exhaust pipe assembly.



6. REMOVE CENTER EXHAUST PIPE ASSEMBLY


    A176009
  1. Remove the 2 bolts and 2 compression springs.

  1. Remove the center exhaust pipe from the 3 exhaust pipe supports.

  1. Remove the gasket from the front No. 3 exhaust pipe sub-assembly.



    A177272
  1. Remove the 2 bolts and exhaust pipe damper.



7. REMOVE FRONT NO. 3 EXHAUST PIPE SUB-ASSEMBLY


    A176010
  1. Remove the 2 bolts, 2 nuts, front No. 3 exhaust pipe sub-assembly, and the 2 gaskets.



8. REMOVE FRONT EXHAUST PIPE ASSEMBLY


    A176011
  1. Remove the 2 nuts, front exhaust pipe assembly and gasket.