CRUISE CONTROL SYSTEM > Cruise Control Switch Circuit |

| 1.READ VALUE USING TECHSTREAM |
![]() |
Connect the Techstream to the DLC3.
Turn the power switch on (IG).
Turn the Techstream on.
Enter the following menus: Powertrain / Cruise Control / Data List.
Check the Data List for proper functioning of the cruise control main switch.
| Tester Display | Measurement Item/Range | Normal Condition | Diagnostic Note |
| CCS Main SW M-CPU | Main switch signal (Main CPU)/ON or OFF | ON: Main switch on OFF: Main switch off | - |
| Cancel Switch | CANCEL switch signal/ON or OFF | ON: CANCEL switch on OFF: CANCEL switch off | - |
| SET/COAST Switch | SET/COAST switch signal/ON or OFF | ON: - SET switch on OFF: - SET switch off | - |
| RES/ACC Switch | RES/ACC switch signal/ON or OFF | ON: + RES switch on OFF: + RES switch off | - |
| Result | Proceed to |
| OK | A |
| NG (All items are defective) | B |
| NG (1 to 3 items are defective) | C |
|
| ||||
|
| ||||
| A | ||
| ||
| 2.INSPECT CRUISE CONTROL MAIN SWITCH |
Remove the cruise control main switch.
Measure the resistance according to the value(s) in the table below.

| Tester Connection | Switch Condition | Specified Condition |
| A-1 (ECC) - A-3 (CCS) | Main Switch off*1 | 1 MΩ or higher |
| Main Switch on | Below 2.5 Ω | |
| + RES | 235 to 245 Ω | |
| - SET | 617 to 643 Ω | |
| CANCEL | 1509 to 1571 Ω |
|
| ||||
| OK | |
| 3.CHECK HARNESS AND CONNECTOR (CRUISE CONTROL MAIN SWITCH - SPIRAL CABLE) |
![]() |
Disconnect the z1 connector from the spiral cable.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| A-3 - z1-3 | Always | Below 1 Ω |
| A-1 - z1-4 | Always | Below 1 Ω |
|
| ||||
| OK | |
| 4.CHECK SPIRAL CABLE |
![]() |
Remove the spiral cable.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Spiral Cable Position | Specified Condition |
| z1-3 (CCS) - D16-1 (CCS) | Center | Below 1 Ω |
| 2.5 rotations to the left | ||
| 2.5 rotations to the right | ||
| z1-4 (ECC) - D16-2 (ECC) | Center | Below 1 Ω |
| 2.5 rotations to the left | ||
| 2.5 rotations to the right |
|
| ||||
| OK | |
| 5.CHECK HARNESS AND CONNECTOR (SPIRAL CABLE - HYBRID VEHICLE CONTROL ECU AND BODY GROUND) |
![]() |
Disconnect the D35 connector from the hybrid vehicle control ECU.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| D16-1 (CCS) - D35-26 (CCS) | Always | Below 1 Ω |
| D35-26 (CCS) - Body ground | Always | 10 kΩ or higher |
| D16-2 (ECC) - Body ground | Always | Below 1 Ω |
|
| ||||
| OK | ||
| ||