Home › HYBRID SYSTEM ยท P310 › HYBRID VEHICLE CONTROL › HYBRID CONTROL SYSTEM

HYBRID CONTROL SYSTEM > CHECK FOR INTERMITTENT PROBLEMS

for Preparation Click here



CHECK FOR INTERMITTENT PROBLEMS
  1. Perform a simulation test (Click here).

    1. For the simulation test, reproduce the driving condition that were present when trouble occurred. Those conditions should be based on the customer's comments and freeze frame data that is recorded with DTCs, such as an opening angle of the accelerator pedal, SOC, engine coolant temperature, engine rpm, and MG1/MG2/MGR rpm and torque.

  2. Check the connector(s) and terminal(s) (Click here).

  3. Wiggle the harness and connector(s) (Click here).

  4. Heat or cool suspected parts (Click here).

    NOTICE:
    Do not directly heat or cool the MG ECU with the inverter cover removed.