Home › Power Source / Network › POWER DISTRIBUTION › INTEGRATION RELAY
RM3160E _57 Power Source / Network _019703 POWER DISTRIBUTION _0100675 INTEGRATION RELAY A

POWER DISTRIBUTION  INTEGRATION RELAY  INSTALLATION  


PROCEDURE

Hide 82644 1.INSTALL SEMICONDUCTOR PWR INTEGRATION ECU

a.

Connect the 5 connectors.


b.
E286299

Engage the 2 claws to install the semiconductor pwr integration ECU as shown in the illustration.


Hide 82662A 2.INSTALL NO. 1 RELAY BLOCK COVER

a.

Engage the 4 claws to install the No. 1 relay block cover.


b.
E286293E01
0.438,0.531 0.594,0.729 0.156,0.198 10 true B 2.938,1.656 3.094,1.854 0.156,0.198 10 true A

Engage the 2 claws (B).


c.

Engage the claw (A) to install the No. 1 relay block cover as shown in the illustration.


Hide 47233 3.INSTALL RESERVOIR BRACKET (for LHD)

a.

Install the reservoir bracket with the 2 bolts.

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)


Hide 47220D 4.CONNECT BRAKE MASTER CYLINDER RESERVOIR ASSEMBLY (for LHD)

a.
E286288

Engage the 2 guides to connect the brake master cylinder reservoir assembly as shown in the illustration.


b.

Install the bolt.

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)


c.

Connect the connector.


Hide 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION