Home › Engine / Hybrid System › 1AR-FE ENGINE CONTROL › RELAY
RM3160E _51 Engine / Hybrid System _019671 1AR-FE ENGINE CONTROL _0106861 RELAY G

1AR-FE ENGINE CONTROL  RELAY  ON-VEHICLE INSPECTION  


PROCEDURE

Hide 1.INSPECT CIRCUIT OPENING RELAY (C/OPN)

A188757
1.906,0.302 2.094,0.302 2.094,0.302 2.146,0.563 false 3.031,0.302 2.813,0.302 2.813,0.302 2.708,0.563 false 2.646,1.115 3.104,1.115 false 2.646,1.604 3.104,1.604 false 0.365,0.771 0.521,0.969 0.156,0.198 10 3 1.813,0.24 1.969,0.406 0.156,0.167 10 1 1.302,1.292 1.458,1.49 0.156,0.198 10 2 0.354,1.302 0.51,1.469 0.156,0.167 10 1 3.094,0.24 3.25,0.438 0.156,0.198 10 2 1.302,0.76 1.458,0.958 0.156,0.198 10 5 3.177,1.031 3.333,1.229 0.156,0.198 10 5 3.177,1.521 3.333,1.719 0.156,0.198 10 3

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
3 - 5 Battery voltage not applied between terminals 1 and 2 10 kΩ or higher
Battery voltage applied between terminals 1 and 2 Below 1 Ω


If the result is not as specified, replace the circuit opening relay (C/OPN).