With the radiator side support assembly and fender apron brace (for HV model) assembly and fender apron brace (for gasoline model) cut and join replacement sections removed.
REMOVAL
| Symbol Meaning | |
|---|---|
|
Remove Weld Points |
|
Remove Weld Points |
|
Remove Weld Points |
Do not butt weld or heat repair because the heat decreases the strength of areas where ultra high strength steel is used. (See the introduction)
INSTALLATION
| Symbol Meaning | |
|---|---|
|
Plug Weld |
|
Plug Weld |
|
Plug Weld |
Temporarily install the new parts and measure each part of the new parts in accordance with the body dimension diagram. (See the body dimensions)
| *1 | FRONT SIDE MEMBER BRACKET SUB-ASSEMBLY | - | - |
| *a | Ultra High Strength Steel Welding Point | - | - |
When welding 2 panels together including 980 MPa or 780 MPa ultra high strength steel.
| *a: Plug weld | Plug diameter | 10 mm (0.39 in.) |
| Wire type | AWS A5.18 ER70S-3 | |
| Shield gas | Metal active gas |
Be sure to use Metal active gas (Ar 80% + CO2 20%) as the shield gas when plug welding.Sufficient weld strength cannot be assured when using 100% CO2 shield gas.
| *1 | REAR SIDE MEMBER SUB-ASSEMBLY | - | - |
| *a | Ultra High Strength Steel Welding Point | - | - |
When welding 3 panels or more together including 980 MPa ultra high strength steel. (When plug welding a third panel to 2 panels which are welded under the conditions described above.)
| *a: Plug weld | Plug diameter | 10 mm (0.39 in.) |
| Wire type | AWS A5.18 ER70S-3 | |
| Shield gas | Metal active gas |
Be sure to use Metal active gas (Ar 80% + CO2 20%) as the shield gas when plug welding.Sufficient weld strength cannot be assured when using 100% CO2 shield gas.
After welding, apply body sealer to the corresponding parts. (See the painting/coating)
After applying the top coat, apply anti-rust agent to the internal panel portion of the closed section structural weld points.