Home › Drivetrain › DRIVE SHAFT / PROPELLER SHAFT › PROPELLER SHAFT ASSEMBLY
RM37A0E _52 Drivetrain _086862 DRIVE SHAFT / PROPELLER SHAFT _0421217 PROPELLER SHAFT ASSEMBLY G

DRIVE SHAFT / PROPELLER SHAFT  PROPELLER SHAFT ASSEMBLY  INSPECTION  


PROCEDURE

Hide 37100 1.INSPECT PROPELLER WITH CENTER BEARING SHAFT ASSEMBLY

a.
C127522

Using a dial indicator, measure the runout of the rear propeller shaft assembly (for front side).

Maximum Runout:

0.6 mm (0.0236 in.)


NOTICE:

The dial indicator must be set at a right angle to the center of the rear propeller shaft assembly.


If the shaft runout exceeds the maximum, replace the propeller with center bearing shaft assembly.


b.
C127523

Using a dial indicator, measure the runout of the rear propeller shaft assembly (for rear side).

Maximum Runout:

0.6 mm (0.0236 in.)


NOTICE:

The dial indicator must be set at a right angle to the center of the rear propeller shaft assembly.


If the shaft runout exceeds the maximum, replace the propeller with center bearing shaft assembly.


c.
C426396

Using a dial indicator, measure the runout of the intermediate shaft assembly.

Maximum Runout:

0.6 mm (0.0236 in.)


NOTICE:

The dial indicator must be set at a right angle to the center of the intermediate shaft assembly.


If the shaft runout exceeds the maximum, replace the propeller with center bearing shaft assembly.