82143
1.INSTALL NO. 3 INSTRUMENT PANEL WIRE
Engage the 4 clamps to install the No. 3 instrument panel wire.
55328
2.INSTALL NO. 1 INSTRUMENT PANEL PIN
for LH Side:
Install the No. 1 instrument panel pin with the screw <B> or <D>.
for RH Side:
Install the No. 1 instrument panel pin with the screw <B> or <D>.
73960A
3.INSTALL INSTRUMENT PANEL PASSENGER AIRBAG ASSEMBLY
55417A
4.INSTALL NO. 2 METER HOOD RETAINER
Install the No. 2 meter hood retainer with the screw <B> or <D>.
55416A
5.INSTALL NO. 1 METER HOOD RETAINER
Install the No. 1 meter hood retainer with the screw <B> or <D>.
55962
6.INSTALL NO. 2 SIDE DEFROSTER NOZZLE
Engage the 2 claws and 2 guides to install the No. 2 side defroster nozzle.
55961B
7.INSTALL NO. 1 SIDE DEFROSTER NOZZLE
Engage the 2 claws and 2 guides to install the No. 1 side defroster nozzle.
86681B
8.INSTALL ANTENNA DIVIDER (w/ Antenna Divider)
for ERA-GLONASS:
Click hereAudio / Visual / Telematics>TELEMATICS>ANTENNA DIVIDER>INSTALLATION
for eCall:
Click hereAudio / Visual / Telematics>TELEMATICS>ANTENNA DIVIDER>INSTALLATION
86706
9.INSTALL TRANSCEIVER ANTENNA BASE SUB-ASSEMBLY (for 12.3 Inch Display)
10.INSTALL NAVIGATION ANTENNA ASSEMBLY WITH BRACKET (w/ Navigation Antenna)
86101
11.INSTALL ANTENNA CORD SUB-ASSEMBLY
86101J
12.INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY (w/ Navigation Antenna)
55971C
13.INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
Install the No. 1 side defroster nozzle duct with the 4 screws <B> or <D>.
55972C
14.INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
Install the No. 2 side defroster nozzle duct with the 2 screws <B> or <D>.
55950G
15.INSTALL DEFROSTER NOZZLE ASSEMBLY
Install the defroster nozzle assembly with the 4 screws <B> or <D>.
55843A
16.INSTALL NO. 1 HEATER TO REGISTER DUCT
Install the No. 1 heater to register duct with the 2 screws <B> or <D>.
55846A
17.INSTALL NO. 4 HEATER TO REGISTER DUCT
Install the No. 4 heater to register duct with the 3 screws <B> or <D>.