Home › ENGINE ยท 5L-E › ENGINE CONTROL SYSTEM › VENTURI

VENTURI > INSTALLATION

for Preparation Click here



1. INSTALL VENTURI ASSEMBLY
  1. Place a new gasket and the venturi on the intake manifold.



    A111053E02
  1. Connect the throttle control motor connector.



    A111052E02
  1. Connect the throttle open switch connector.



2. INSTALL INTAKE FLANGE


    A114285
  1. Install a new gasket and the intake flange with the 3 nuts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Connect the ventilation hose with the clamp.



    A114284
  1. Connect the manifold absolute pressure sensor connector.



    A114283
  1. Install the clamp of the heater hose with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



3. INSTALL INTAKE PIPE ASSEMBLY


    A114290
  1. Connect the intake pipe to the intake flange with the clamp.

  1. Fix the intake pipe in place with the 2 bolts and clamp.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf } for bolt
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf } for clamp



4. CONNECT NO. 1 AIR CLEANER HOSE
  1. Connect the air cleaner hose to the air cleaner and intake pipe with the 2 clamps.

  1. Fix the intake pipe in place with the 2 clamps.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the IAT sensor connector.

  1. Attach the clamp of the IAT sensor harness.



5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


6. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.