TRANSMISSION WIRE > INSTALLATION |
| 1. INSTALL TRANSMISSION WIRE |
![]() |
Coat a new O-ring with the ATF, and install it to the transmission wire connector.
Install the transmission wire with the bolt.
Connect the transmission wire connector.
| 2. CONNECT TRANSMISSION WIRE |
![]() |
Connect the 7 connectors to the solenoid valves.
Connect the 2 ATF temperature sensors with the 2 clamps and 2 bolts.
| 3. INSTALL VALVE BODY OIL STRAINER ASSEMBLY |
![]() |
Coat a new O-ring with ATF and install it to the oil strainer.
| 4. INSTALL AUTOMATIC TRANSMISSION OIL PAN SUB-ASSEMBLY |
![]() |
Install a new gasket and the oil pan with the 20 bolts.
| 5. INSTALL NO. 1 ENGINE MOUNTING INSULATOR REAR (for 1KD-FTV) |
![]() |
Install the engine mounting insulator to the transmission with the 4 bolts.
| 6. INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY (for 1KD-FTV) |
![]() |
Install the frame crossmember to the engine mounting insulator with the 4 set bolts.
Connect the ends of the frame crossmember to the vehicle with the 4 bolts and 4 nuts.
| 7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 8. PERFORM INITIALIZATION |
Perform initialization (Click here).
| 9. ADD AUTOMATIC TRANSMISSION FLUID |
Add automatic transmission fluid (Click here).