Home › ENGINE ยท 2KD-FTV › STARTING › STARTER (for 2.7 kW Type)

STARTER (for 2.7 kW Type) > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY


    A122692E01
  1. Connect the ground cable and install the starter with the 2 nut and bolt.

    HINT:
    Make sure to connect the ground cable with the nut as shown in the illustration.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }



    A111850
  1. Install the starter wire to terminal 30 with the nut.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the starter connector.

  1. Install the clutch release cylinder.



2. CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY


G034223E01
  1. Install the release cylinder with the 2 bolts.

    Torque:
    12 N*m{ 120 kgf*cm , 9 ft.*lbf }



3. INSTALL FRONT FENDER SEAL
  1. Install the seal with the 5 clips.



4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).