Home › ENGINE ยท 2KD-FTV › ENGINE CONTROL SYSTEM › DIESEL THROTTLE BODY (w/ EGR Cooler)

DIESEL THROTTLE BODY (w/ EGR Cooler) > INSTALLATION

for Preparation Click here



1. INSTALL DIESEL THROTTLE BODY ASSEMBLY


    A135921
  1. Install a new gasket and the throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



    A135920
  1. Connect the 2 connectors.



2. INSTALL INTERCOOLER ASSEMBLY WITH INTAKE AIR CONNECTOR
  1. Install the intake air connector to the air hoses.



    A135919
  1. Install the intercooler with the 4 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



    A135918
  1. Tighten the 2 clamps.



    A149802
  1. Connect the IAT sensor connector and manifold absolute diesel pressure sensor connector.

  1. Connect the vacuum hose to the manifold absolute pressure sensor.

  1. Attach the 2 clamps.



3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY


A135916
  1. Install the engine cover with the 3 bolts and 2 nuts.

    Torque:
    7.0 N*m{ 71 kgf*cm , 62 in.*lbf }



4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


5. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.