Home › ENGINE ยท 2KD-FTV › EMISSION CONTROL › EGR VALVE (w/o EGR Cooler)

EGR VALVE (w/o EGR Cooler) > INSTALLATION

for Preparation Click here



1. INSTALL EGR VALVE ASSEMBLY
  1. Install a new gasket and the EGR valve.



2. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY


    G037199E02
  1. Install 2 new gaskets and the pipe with the 2 nuts and 2 bolts.

    HINT:
    The gasket's claws should be on the pipe side.



3. INSTALL INTAKE AIR CONNECTOR


    A099620E01
  1. Install a new gasket and the air connector with the 2 nuts and bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



4. INSTALL THROTTLE BODY BRACKET
  1. Install the bracket with the 3 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



5. INSTALL DIESEL THROTTLE BODY ASSEMBLY


A111832
  1. Install a new gasket and the throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



    A111790
  1. Connect the 2 connectors.



6. INSTALL VACUUM SWITCHING VALVE BRACKET


    A114169
  1. Install the bracket with the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the vacuum hoses to the 2 locations.

  1. Connect the 2 connectors.



7. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY


A111789
  1. Connect the pipe (with the 2 air hoses) and install the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 clamps.

  1. Connect the vacuum hose to the gas filter.

  1. Connect the manifold absolute pressure sensor connector.



8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


9. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.